2.8km |
07/10/2024 |
N/A |
Lands at Luddenmore Townland and Inch St Lawrence South Townland , Ballyneety , County Limerick |
the development that will consist of the following works: (a) Demolition and removal of existing build on-site. (b) The construction of a new open cycle Turbine Power Generation Station with an output of up to 299 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission ... login required. |
Details... |
420m |
12/04/2024 |
CONDITIONAL |
Srahane , Ballysimon , Co. Limerick |
the construction of a dwelling extension, new septic tank & percolation area and all associated site works... login required. |
Details... |
2km |
16/03/2024 |
CONDITIONAL |
Cahernarry [Cripps] , Ballyneety , Co. Limerick |
a change of house type under previously permitting governing permission Planning Reference Number 21/196 together with all associated site works... login required. |
Details... |
1.1km |
29/02/2024 |
CONDITIONAL |
Srahane East , Ballysimon , Co. Limerick |
changes to dwelling renovation & extension under construction consisting of changes to the floor area & elevations of the dwelling from that granted under planning ref 22-849 & for permission for completion of the above works... login required. |
Details... |
2km |
28/11/2023 |
CONDITIONAL |
Cahernarry [ Cripps] , Ballyneety , Co. limerick |
a change of house type under previously permitting governing permission Planning Reference Number 21/195 together with all associated site works... login required. |
Details... |
2.7km |
03/11/2023 |
N/A |
Inch St. Lawrence North , Ballyneety , Co. Limerick. |
as Built Extensions and Entrance including All Ancillary Works... login required. |
Details... |
2.7km |
15/09/2023 |
N/A |
Inch St. Lawrence North , Ballyneety , Co. Limerick. |
as Built Extensions and Entrance including All Ancillary Works... login required. |
Details... |
2.8km |
08/08/2023 |
N/A |
Luddenmore Townland and Inch St Lawrence South Townland , Ballyneety , Co. Limerick |
the demolition and removal of existing build on-site. The construction of a new Gas Fired open cycle Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1 no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelt... login required. |
Details... |
2.5km |
15/06/2023 |
CONDITIONAL |
Amberleigh House , Cloghnadromin Ballysimon , Limerick |
the carry out of alterations and demolitions and the construction of an extension to existing dwelling including all associated site development works... login required. |
Details... |
1.8km |
14/06/2023 |
CONDITIONAL |
Luddenbeg , Ballyneety , Co. Limerick |
the change of house type under previously permitted governing Planning Permission 22-1082 together with all associated site works... login required. |
Details... |
1.7km |
22/03/2023 |
N/A |
Kilculleen , Ballyneety , Co. Limerick |
unauthorised structures ie. single storey extension to the rear of the house consisting of kitchen/dining room, utility and bathroom. Permission for a new front boundary wall and new wastewater treatment system and polishing filter... login required. |
Details... |
2.9km |
08/03/2023 |
N/A |
drombanna , Co. Limerick , Co. Limerick |
the construction of a new warehouse ( 738 sq m) with ancillary offices ( 114 sq m), access via existing vehicular entrance serving this existing commercial site, connection to existing permitted waste water treatment system & polishing filter on site together with associated siteworks... login required. |
Details... |
2.7km |
13/02/2023 |
N/A |
Luddenmore Townland and Inch St Lawrence South Townland , Ballyneety , Co. Limerick |
the development that will consist of the following works: (a) demolition and removal of existing build on-site, (b) the construction of a new Gas Fired open cycle Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 44 m high Exhaust Stack, 1 no. AlS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emi... login required. |
Details... |
2.9km |
19/01/2023 |
CONDITIONAL |
Ballymacreese , Ballyneety , Co. Limerick |
the improvement of existing vehicular entrance, demolition of existing substandard dwelling house, construction of a replacement dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.3km |
14/12/2022 |
REFUSED |
Ahabeg , Ballysimon , Co. Limerick |
a vehicle storage shed and the retention of a site entrance... login required. |
Details... |
2.3km |
01/12/2022 |
CONDITIONAL |
Ahabeg and Clooncunna North , Ballysimon Road , Co. Limerick |
the demolition of the substandard dwelling house, the construction of a replacement dwelling house, domestic garage, domestic wastewater treatment system with polishing filter together with all associated site works ... login required. |
Details... |
30m |
29/11/2022 |
CONDITIONAL |
Bohermore N.S. , Ballysimon , Co. Limerick |
the construction of a staff car park, new vehicle entrance from the public road, new wastewater treatment unit, percolation area and ancillary site works... login required. |
Details... |
2km |
17/10/2022 |
CONDITIONAL |
Scart , Ballyneety , Co. Limerick |
existing extension to existing dwelling. Permission for renovations and extension to existing dwelling house and all associated site works... login required. |
Details... |
1.8km |
07/10/2022 |
CONDITIONAL |
Luddenbeg , Ballyneety , Co. Limerick. |
the construction of a new shared vehicular entrance & passageway, dwelling house, domestic wastewater treatment system with polishing filter together with all associated site works. Planning permission is also being sought for the remo... login required. |
Details... |