710m |
05/09/2024 |
N/A |
'Taylors Cross' Fanningstown , Fedamore , Co. Limerick |
the construction of a vehicular entrance, dwelling house, garage, domestic waste water treatment system & polishing filter together with all associated site works... login required. |
Details... |
1.7km |
03/07/2024 |
CONDITIONAL |
Kilpeacon , Crecora , Limerick. |
the modification of an existing dwelling to allow for the construction of two dormer extensions; modification of the existing ground floor and first floor, an ou... login required. |
Details... |
2.9km |
05/06/2024 |
N/A |
Ballinagarde , Ballyneety , County Limerick |
the existing horticultural poly-tunnels, the horticultural steel storage containers, the horticultural storage timber sheds, the car parking area, the horticultural allotments, the horticultural nursery, the dwelling h... login required. |
Details... |
2.2km |
24/05/2024 |
N/A |
Greenhills , Crecora , Co. Limerick |
to construct an extension to the side and rear of existing dwelling and permission to complete associated renovation works and associated site works... login required. |
Details... |
1km |
29/03/2024 |
CONDITIONAL |
Fanningstown , Crecora , Co. Limerick. |
a change of house type under previously permitting governing permission Planning Reference Number 22/1162 together with all associated site works... login required. |
Details... |
2.7km |
29/11/2023 |
CONDITIONAL |
Ballinagarde , Ballyneety , Co. Limerick. |
the construction of a new dwelling house, a waste water treatment system, driveway and entrance from public road with all associated site works... login required. |
Details... |
2km |
13/10/2023 |
CONDITIONAL |
Kilderry , Crecora , Co. Limerick |
(1) front porch extension, (2) garage conversion, (3) link corridor, (4) rear sun room extension, (5) storage shed attached to house & (6) shed in rear garden... login required. |
Details... |
3km |
18/08/2023 |
CONDITIONAL |
Dooley Park , Raheen , Ballyneety |
the construction of 2 number Hurling Walls with associated Lighting, relocation of existing carparking spaces to facilitate the construction of the hurling walls, provision of revised carking layout with associated lighting within the existing grounds together with all associated site works... login required. |
Details... |
2.8km |
06/07/2023 |
REFUSED |
Ballinagarde , Ballyneety , Co. Limerick. |
temporary polytunnels, temporary storage containers, parking area, allotments, nursery (Etna Plants) and all associated site works ... login required. |
Details... |
1.7km |
19/06/2023 |
CONDITIONAL |
Newtown , Crecora , Co. Limerick |
the construction of an extension to an existing dwelling house, upgrade existing entrance and all other associated site works. The development will consist of 1) ... login required. |
Details... |
750m |
18/03/2023 |
CONDITIONAL |
Fanningstown , Fedamore , Co. Limerick |
the construction of A Dwelling House, Package Wastewater Treatment System, Percolation Area, Entrance and All Ancillary Site Works... login required. |
Details... |
1.4km |
02/03/2023 |
CONDITIONAL |
3 Carnane , Fedamore , Co. Limerick. |
the existing dwelling house and detached domestic garage/store as constructed and all associated site works... login required. |
Details... |
710m |
24/02/2023 |
CONDITIONAL |
Fanningstown , Fedamore , Co. Limerick. |
the Construction of A Dwelling House, Package Wastewater Treatment System, Percolation Area, Entrance and All Ancillary Site Works... login required. |
Details... |
2.9km |
15/02/2023 |
CONDITIONAL |
South Liberties GAA Club , Dooley Park Raheen , Ballyneety Co. Limerick. |
the change of use of part of existing clubroom for use as Pre-school Childcare services between the hours of 8.45am to 3pm - Monday to Friday together with all associated site works at Sou... login required. |
Details... |
2.9km |
09/02/2023 |
N/A |
South Liberties GAA Club , Dooley Park Raheen , Ballyneety Co. Limerick. |
the change of use of part of existing clubroom for use as Pre-school Childcare services between the hours of 8.45am to 3pm - Monday to Friday together with all associated site works at Sou... login required. |
Details... |
2.9km |
21/12/2022 |
CONDITIONAL |
Dooley Park , Raheen , Ballyneety |
the installation of lighting to the walking track consisting of 24 no. luminaries on 6m high standards... login required. |
Details... |
2.6km |
14/12/2022 |
CONDITIONAL |
Dooley Park , Raheen , Ballyneety |
the erection of two dugouts at the main playing pitch... login required. |
Details... |
2.7km |
09/12/2022 |
REFUSED |
Enaghroe , Fedamore , Co. Limerick |
the construction of a dwelling house, entrance, wastewater treatment system, percolation area and all associated site works... login required. |
Details... |
990m |
28/10/2022 |
CONDITIONAL |
Fanningstown , Crecora , Co. Limerick |
the construction of an entrance, dwelling house, garage, septic tank and percolation area together with all associated site works... login required. |
Details... |