1.8km |
17/07/2024 |
CONDITIONAL |
Ballynacragga , Newmarket-on-Fergus , Co. Clare |
to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works... login required. |
Details... |
1.8km |
12/01/2024 |
N/A |
Ballynacragga , Newmarket on Fergus , Co. Clare |
for the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
2.5km |
13/07/2023 |
CONDITIONAL |
Castlefergus , Quin , Co Clare |
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
710m |
28/06/2023 |
CONDITIONAL |
Ballygirreen , Newmarket-on-Fergus , Co Clare |
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
2.9km |
16/03/2023 |
CONDITIONAL |
Islandmagrath , Clarecastle , Co Clare |
the development will consist of a dwelling house with proprietary wastewater treatment system & polishing filter together with ancillary site works... login required. |
Details... |
2.5km |
13/03/2023 |
N/A |
Castlefergus , Quin , Co Clare |
for development which will consist of the construction of a dwelling house garage a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
1.2km |
05/12/2022 |
CONDITIONAL |
Boheraroan , Newmarket on Fergus , Co. Clare |
for development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan, Newmarket-on-Fergus, Co. Clare and an associated rising main traversing the townlands of Ballyconneely, Ballynacragga, Boheraroan, Dromoland, Latoon North, Latoon South, Manusmore, Newmarket and Rathfolan, County Clare. The development will compromise proposed works within the existing Newmarket-on-Fergus Wastewater Treatment Plant, including: a. 1 No. 7.8m high storm storage tank with minimum storage capacity of 516m3, measuring approximately 11m diameter. Between 3.6m - 5.0m will be above ground level, the remainder will be buried below ground level b. New below-ground discharge pumping station with associated below-ground valve chambers and wet well c. New 4.1m high tertiary treatment system (including 2 No. tertiary filter units and flocculation tank with a volume of... login required. |
Details... |
1.8km |
02/12/2022 |
N/A |
Ballynacragga , Newmarket on Fergus , Co. Clare |
to construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works to an infill site... login required. |
Details... |
1.7km |
26/10/2022 |
N/A |
Ballynacragga , Newmarket-on-Fergus , Co Clare |
to construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works on an infill site... login required. |
Details... |
1.8km |
14/09/2022 |
CONDITIONAL |
Manusmore , Clarecastle , Co Clare |
of (a) 'as constructed existing' dwelling house i.e. (P8/13134) (b) 'change of use' of attached garage from previous domestic garage use to ancillary granny flat accommodation. (c)all ancillary site works and services ... login required. |
Details... |
880m |
16/08/2022 |
CONDITIONAL |
12 Orchard Wood , Dromoland , Newmarket-on-Fergus Co Clare |
of upper floor garage... login required. |
Details... |
1.4km |
15/07/2022 |
UNCONDITIONAL |
Manusmore Clarecastle , Latoon South Latoon North & Dromoland , Newmarket-on-Fergus Co Clare |
to carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located appro... login required. |
Details... |
1.8km |
02/09/2021 |
CONDITIONAL |
Ballynacragga , Newmarket-on-Fergus , Co Clare |
of alterations to the dwelling house including new side extension, elevational changes and private garage along with all associated site works and ancillary services ... login required. |
Details... |
2.7km |
27/08/2021 |
CONDITIONAL |
Manusmore and Carrownanelly , Clarecastle , Ennis Co Clare |
the development will consist of planning PERMISSION for a period of five years to construct and complete a Solar PV Energy development with a total site area of 16.08 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, watercourse crossing, security fencing, electrical cablin... login required. |
Details... |
2.9km |
17/06/2021 |
CONDITIONAL |
Island McGrath , Clarecastle , Co Clare |
to construct an agricultural storage barn including all ancillary site works and services... login required. |
Details... |
1.5km |
06/05/2021 |
CONDITIONAL |
Manusmore , Clarecastle , Co Clare |
to construct a storage shed together with ancillary site development works and services... login required. |
Details... |
1.9km |
15/04/2021 |
CONDITIONAL |
Dromoland Estate , Newmarket on Fergus , Co Clare |
to construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works ... login required. |
Details... |
870m |
08/03/2021 |
CONDITIONAL |
No.1 Orchard Wood , Dromoland , Newmarket-on-Fergus Co Clare |
for development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works ... login required. |
Details... |