2.5km |
29/03/2024 |
N/A |
Ballycunneen , Newmarket-on-fergus , Ennis |
to Demolish existing substandard Garage and Permission for the Construction of a Domestic Garage and Store including ancillary site works... login required. |
Details... |
790m |
28/03/2024 |
N/A |
Sensing House , East Park Smithstown , Shannon |
for development consisting of proposed roof mounted Photovoltaic PV panels on existing roof and all associated site works ... login required. |
Details... |
210m |
27/03/2024 |
N/A |
Mincon International Limited , Smithstown Industrial Estate , Shannon Co. Clare |
to RETAIN the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works ... login required. |
Details... |
1.9km |
01/03/2024 |
N/A |
No 117 Cluain Airne , Shannon , Co Clare |
to RETAIN a complete single storey garage to the rear an a complete single storey extension to the side of existing semi-detached bungalow... login required. |
Details... |
2.3km |
22/02/2024 |
N/A |
Clonmoney West , Bunratty , Co. Clare |
of existing single-story extension and wastewater treatment system. Planning permission is also being sought to demolish existing substandard conservatory, construct a single storey extension and a first-floor extension to include a balcony... login required. |
Details... |
1.5km |
21/02/2024 |
CONDITIONAL |
3 Inis Sioda , Shannon , Co Clare |
for development, the development will consist of an attic conversion to a living space to existing dwelling, a retention permission for a material change o... login required. |
Details... |
400m |
01/02/2024 |
N/A |
Smithstown Light Engineering , Bay H1A - Smithstown Industrial Estate Shannon , Co. Clare |
for development, the development will consist of proposed roof mounted Photovoltaic PV panels on an existing profile metal roof and all associated site works ... login required. |
Details... |
1.8km |
20/12/2023 |
N/A |
Clonmoney West , Shannon , Co. Clare |
to import inert fill to agricultural lands to improve the agricultural output of the land, provide for internal access road and all ancillary site works required to facilitate the proposed development ... login required. |
Details... |
940m |
19/12/2023 |
CONDITIONAL |
Shannon Town Centre , Tullyvarraga & Tullyglass , Shannon Co Clare |
for the amalgamation of units no. 40a (Dealz) and Units 37-40 (Formerly Iceland) to form one single retail unit in the Shannon Town Centre Shopping Centre. PERMISSION is being sought for the outlined as well as signage, internal demolition, and all associated site development works... login required. |
Details... |
1.1km |
11/12/2023 |
CONDITIONAL |
23 Tullyvarraga Crescent , Shannon , Co Clare |
of dwelling house and attached garage as constructed and all associated site works... login required. |
Details... |
1.2km |
29/11/2023 |
CONDITIONAL |
Drumline , Newmarket on Fergus , Co Clare |
of the following: a) RETAIN existing 1st floor living area and rear storage shed. b) PERMISSION to extend the front wall of the house to enlarge existing bedrooms ... login required. |
Details... |
900m |
27/11/2023 |
CONDITIONAL |
11 Ballycasey Close , Ballycaseymore , Shannon Co . Clare |
for the demolition of part of road boundary wall and modify existing kerb to construct new vehicular entrance to existing dwelling including ancillary site works... login required. |
Details... |
2.3km |
23/11/2023 |
CONDITIONAL |
Block N Bay 114-115 , Shannon Free Zone Shannon , Co. Clare |
for an extension to the existing metal fabrication workshop together with all ancillary works. A Natura Impact Statement (NIS) will be lodged as part of this application ... login required. |
Details... |
970m |
27/10/2023 |
CONDITIONAL |
27 Cluain Aoibheann , Shannon , Co. Clare |
for the construction of ground floor extension to the rear of the existing dwelling and all associated site works... login required. |
Details... |
2.7km |
27/10/2023 |
CONDITIONAL |
Ei Electronics Campus , Shannon Industrial Estate , Shannon Co . Clare |
for the demolition of existing industrial/ commercial building at Bays 40 and 41 along with the partial demolition of Bay 39 at the Ei Electronics Campus, Shannon In... login required. |
Details... |
2.6km |
19/10/2023 |
CONDITIONAL |
EI Electronics Campus , Shannon Industrial Estate , Shannon Co Clare |
for the construction of a new lift facility and all associated works ... login required. |
Details... |
780m |
11/10/2023 |
CONDITIONAL |
St Aidan's National School Smithstown , Shannon , Co. Clare |
the development will comprise of the construction of a single storey extension, comprising one mainstream classroom, one SET room, associated circulation space and... login required. |
Details... |
1.4km |
25/09/2023 |
CONDITIONAL |
St Caimins Community College , Cronan Lawn Tullyvarraga , Shannon Co. Clare |
for a proposed bus set down area and associated site works, including the construction of a new exit gateway with associated signage along the line of the existing boundary, to the western side of the existing site... login required. |
Details... |
650m |
30/08/2023 |
CONDITIONAL |
Shannon Springs Hotel , Ballycasey , Shannon Co Clare |
to 1) reconfiguration of second floor layout from granted planning ref 19/844 to create 1 no additional bedroom. 2) construct new dormer window to South - West evaluation and all associated site works ... login required. |
Details... |