2.7km |
12/04/2024 |
N/A |
The Old Creamery Enterprise Centre , Farran , Ardagh |
a change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new ext... login required. |
Details... |
2.5km |
08/04/2024 |
N/A |
Glenastar , Ardagh , Co. Limerick. |
the construction of a new slatted livestock house adjacent to existing farm buildings. Proposed livestock house to incorporate easy feed, underground slatted slurr... login required. |
Details... |
2.7km |
21/02/2024 |
N/A |
The Old Creamery Enterprise Centre , Farran Ardagh , Co. Limerick |
a change of use of a portion of the existing light industrial building to 9 no. residential apartment units and associated site works. The development will consist of changes to elevations to accommodate new ext... login required. |
Details... |
1.1km |
16/01/2024 |
N/A |
Kilrodane , Ardagh , Newcastle West |
the construction of an easy feed slatted cubicle house with underground slatted tank, feed barriers, feed passage, ancillary concrete and walkway, and all associated ancillary site works at our farmyard... login required. |
Details... |
2.5km |
15/01/2024 |
N/A |
Ballylin , Ardagh , Co. Limerick |
the construction of a dormer style dwelling house, domestic garage, entrance, driveway, wastewater treatment unit, polishing filter and all ancillary site works... login required. |
Details... |
2.6km |
15/12/2023 |
CONDITIONAL |
Drominmacturlough , Newcastlewest , Co Limerick |
the construction of a new single storey dwelling, entrance, domestic garage, wastewater treatment system and polishing filter, and ancillary works... login required. |
Details... |
1.9km |
14/11/2023 |
CONDITIONAL |
Cois Teampaill , Churchtown , Newcastle West |
the construction of 14 residential units in total comprising of seven no. two-storey terraced town houses and seven no. single-storey terraced bungalows, demolition and removal of existing unfinished foundations, and associated site works... login required. |
Details... |
2.3km |
10/11/2023 |
CONDITIONAL |
Ballylin , Ardagh , Co. Limerick |
the construction of a ground & first floor extension to existing dwelling house, revisions to site boundaries, relocation of vehicular entrance, removal of second vehicular entrance and all ancillary site works... login required. |
Details... |
2.8km |
09/11/2023 |
N/A |
Limerick Greenway , Kilreash , Ardagh |
the development of the Limerick Greenway Hub @Ardagh. The Ardagh Station House, Goods Shed, Railway Carriage and site will become one of the main Visitor Experiences and Service Centre Hubs on the Limerick Greenway. Development to include: Refurbishment and renovation of the Ardagh Station House and Goods Shed (which is a protected structure, RPS 900) and change of use to commercial, community and tourism. Develop the buildings and site to include toilets, café, playground, interpretation and camper van facilities. The provision of on-site parking to include car and universal access parking spaces, electric vehicle charging point spaces and camper van parking bays. Installation of a railway carriage on the site for commercial, community, and tourism use, and all associated site works. Construction of extensions to the Station House and Goods Shed. Works to include all site development works for the buildings and site including utilities, draina... login required. |
Details... |
1.3km |
24/10/2023 |
CONDITIONAL |
Churchtown , Newcastle West , Co. Limerick |
the demolition of the existing dwelling house and outbuildings, construction of a new replacement dwelling house, upgrade and utilise existing vehicular entrance, upgrade existing onsite effluent disposal system with all associated site works... login required. |
Details... |
2.4km |
01/08/2023 |
CONDITIONAL |
Ballinabearna , Newcastle West , Co. Limerick |
existing milking parlour & slatted section of existing slurry pit. Permission also requested to construct a cubicle house, slatted tanks, concrete aprons and the slatting of an additional section of existing slurry pit... login required. |
Details... |
2.3km |
26/07/2023 |
CONDITIONAL |
Glenastar , Ardagh , Co. Limerick |
the construction of a two storey extension to the existing dwelling house, installation of a wastewater treatment unit, polishing filter and all ancillary site works... login required. |
Details... |
2.7km |
13/04/2023 |
CONDITIONAL |
Ballyine , Newcastlewest , Co.Limerick |
filling proposed land with suitable material to the proposed levels and all associated site works... login required. |
Details... |
1.6km |
23/03/2023 |
CONDITIONAL |
Ashgrove , Newcastlewest , Co.Limerick |
a dwelling house, waste water treatment system, percolation area, site entrance and all associated site works... login required. |
Details... |
1000m |
12/01/2023 |
REFUSED |
Ballylahiff , Newcastle West , Co. Limerick |
the demolition of a section of the existing fence and construction of a new vehicular entrance to service the existing development with a proposed new entrance sign. Siteworks to includ... login required. |
Details... |
1.9km |
21/12/2022 |
CONDITIONAL |
Dromin Beesom , Newcastle West , Co. Limerick |
a change of house type from that previously approved under planning application reference 21/638... login required. |
Details... |
2.4km |
12/10/2022 |
CONDITIONAL |
Ballylin , Ardagh , Co. Limerick |
alterations, renovations and extensions to an existing dwelling house comprising an independent living unit attached to existing dwelling, construct a new detached garage, a new wastewater treatment system and polishing filter and all associated site works... login required. |
Details... |
2.7km |
24/06/2022 |
N/A |
O'Connor Park , Reerasta North , Ardagh Co. Limerick |
the construction of 10 no. housing units in addition to ancillary site works comprising of a new vehicular junction (with the R521), an access road, services, footpaths, parking, boundary treatment and landscaping units... login required. |
Details... |
1.1km |
22/04/2022 |
CONDITIONAL |
Sysco Foods Ireland Unlimited Company , Pallas Foods , Ballylahiff Newcastle West Co. Limerick |
the erection of 814.13 m2 or 151.30 kWp of photovoltaic panels on the roof of our factory of Pallas Foods, Newcastle West with all associated site works... login required. |
Details... |