0m |
19/11/2024 |
N/A |
Ballindillanig, Churchtown, Mallow, Co.Cork |
Permission to (a) construct a new dwelling house, (b) modify an existing entrance and (c) install a new septic tank, percolation area and all associated site works... login required. |
Details... |
2km |
22/10/2024 |
N/A |
Shinanagh, Ballyhea, Co Cork, |
Permission for the erection of a 24 metre lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together ... login required. |
Details... |
1.8km |
26/08/2024 |
Conditional Permission |
Lisballyhay, Charleville, Co.Cork, |
1) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment unit and tertiary treatment system. 2) Permission for retention o... login required. |
Details... |
2.4km |
16/11/2023 |
N/A |
Knockroundaly, Churchtown, Co. Cork, P51D79R |
Permission to (A) Demolish existing out building to rear of existing dwelling, (B) Construct a new extension to rear of existing dwelling, (C) Replace existing... login required. |
Details... |
2.3km |
10/08/2023 |
N/A |
Lisballyhay, Charleville, Co.Cork, |
Permission to construct a dwelling house, garage, entrance, waste water treatment system and all other site works. Extension of Duration to Permission granted under Planning Ref. No. 19/4457... login required. |
Details... |
2.5km |
31/07/2023 |
N/A |
Kilbroney, Buttevant, Co Cork, |
Construct a new dwelling house.... login required. |
Details... |
3km |
23/12/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling... login required. |
Details... |
2.5km |
23/12/2022 |
Refused |
Ballyroe & Dromin, Ballyhea, Charleville, Co.Cork |
Permission to amend the design of the previously approved development (pl. ref. no 20/4041) which comprises consent for a solar PV energy development . The proposed amendments include: (1) increase in number of transformers, (2) increase in size of transformers, (3) reduction in the spacing of solar PV rows (strings), (4)increase in size of solar panels, (5) reduction ... login required. |
Details... |
50m |
06/12/2022 |
Refused |
Ballindillanig, Churchtown, Mallow, Co. Cork |
(a) Construct a two-storey dwelling house, (b) amend existing entrance and (c) install a septic tank and all associated site works.... login required. |
Details... |
50m |
09/11/2022 |
N/A |
Ballindillanig, Churchtown, Mallow, Co Cork |
(a) construct a two-storey dwelling house, (b) amend existing entrance, (c) install a septic tank and all associated site works.... login required. |
Details... |
100m |
18/10/2022 |
Conditional Permission |
Ballindillanig, Churchtown, Mallow, Co.Cork |
Permission to construct a uncovered manure pit with underground effluent storage tank, a screen wall and all associated site and ancillary works... login required. |
Details... |
2.9km |
11/10/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b)... login required. |
Details... |
2.4km |
23/08/2022 |
Conditional Permission |
The Townlands of Fiddane, Cooliney, Ballynoran, , Coolcaum & Ballyroe,, Charleville, Co.Cork., |
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyr... login required. |
Details... |
2.6km |
19/07/2022 |
Conditional Permission |
1 Egmont View, Churchtown, Mallow, Co. Cork |
Permission for retention of an existing front porch to a dwelling house, permission for retention for a detached domestic garage and attached stores, a disused dog kennel, compound and stores and a detached domestic garden store. ... login required. |
Details... |
2.3km |
18/07/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclo... login required. |
Details... |
2.4km |
21/06/2022 |
N/A |
Coolcaum, Churchtown, Mallow, Co. Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation encl... login required. |
Details... |
2.8km |
06/04/2022 |
Conditional Permission |
Egmont, Churchtown, Mallow, Co.Cork |
1) The construction of a dry store and (2) all associated site works... login required. |
Details... |
2.6km |
26/01/2022 |
N/A |
Lisballyhay, Charleville, Co.Cork, |
To construct a proposed new agricultural building for the purpose of storing hay/straw, general agricultural products, farm machinery & horse exercising for own use... login required. |
Details... |
170m |
29/11/2021 |
Refused |
Ballindillanig, Churchtown, Mallow, Co. Cork |
To (a) construct a two storey dwelling house (b) Install mechanical treatment unit and polishing filter and all associated site works.... login required. |
Details... |