1.1km |
22/10/2024 |
N/A |
Ironmines, Mallow, Co. Cork, |
Permission for extension to rear of existing dwelling... login required. |
Details... |
1.4km |
30/08/2024 |
N/A |
Annabella, Mallow, Co.Cork, |
Permission for alterations & extensions to existing dwelling, including new secondary treatment system and soil polishing filter and all associated site works... login required. |
Details... |
1.6km |
21/08/2024 |
N/A |
Annabella, Mallow, Co.Cork, |
Permission to construct a new dwelling house with domestic garage, entrance, wastewater treatment unit with percolation area and all associated site and ancillary works... login required. |
Details... |
1.3km |
13/08/2024 |
N/A |
Annabella, Mallow, Co. Cork, |
Permission for the construction of a creche facility to serve the adjacent permitted residential development (Cork County Council Ref. 15/6119 (extended under Ref. No. 20/6130) and all associated ancillary site development works including veh... login required. |
Details... |
1.9km |
06/08/2024 |
N/A |
The Mallow South Town Centre Development,, (under construction),, bounded by West End & Park Road,, Annabella, Mallow, Co. Cork. |
Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms pa... login required. |
Details... |
1.8km |
02/08/2024 |
Conditional Permission |
Annabella,, West End & Park Road (N72),, Mallow,, Co. Cork. |
Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totalling 317.3 sq.m gross floor space) of the newly constructed Lidl licensed discount foodstore (granted permission under Cork County Council Planning Reg. Ref. No.: 20/05063). The proposed development consists of the change of ... login required. |
Details... |
1.2km |
24/07/2024 |
N/A |
Annabella, Mallow, Co. Cork, |
Permission for the construction of 3 new academy playing pitches, provision 2no. 40 foot containers to be used as changing areas, new site entrance, associated parking area and associated site works.... login required. |
Details... |
1.9km |
22/07/2024 |
Conditional Permission |
Knockrua, Mount Ruby, Killetra, Mallow, Co. Cork |
Permission for a package wastewater treatment plant, percolation area and associated pipework and to decommission the existing septic tank and soakpit.... login required. |
Details... |
1.6km |
17/07/2024 |
N/A |
Annabella, Mallow, Co. Cork, |
Permission to construct a new dwelling house with domestic garage, entrance, wastewater treatment unit with percolation area and all associated site and ancillary works.... login required. |
Details... |
1.8km |
12/07/2024 |
N/A |
West End & Park Road (N72), Annabella, Mallow, co.Cork |
Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totaling 317.2 sqm gross floor space) of the newly constructed Lidl licensed discount food store (granted permission under Cork County Council planning reg ref no. 20/5063). The proposed development consists of the change o... login required. |
Details... |
1.3km |
02/07/2024 |
Conditional Permission |
5 Springwood, Annabella, Mallow, Co. Cork |
Permission for the removal of front porch structure, removal of two chimney structures, extension of hallway and sitting room to front, amendment of front façade and glazing at kitchen, demolition of existing rear conservatory, construction of new single storey rear living room extension and patio ar... login required. |
Details... |
1.9km |
28/06/2024 |
N/A |
Knockrua, Mount Ruby, Killetra, Mallow, Co. Cork |
Permission for a package wastewater treatment plant, percolation area and associated pipework and to decommission the existing septic tank and soakpit, to serve their existing dwelling.... login required. |
Details... |
1.4km |
28/05/2024 |
N/A |
5 Springwood, Annabella, Mallow, co.Cork |
Permission for removal of front porch, removal of two chimney structures, extension of hallway and sitting room to front, amendment of front façade and glazing at kitchen, demolition of existing rear conservatory, construction of new single storey rear living room extension and patio area... login required. |
Details... |
1.6km |
27/05/2024 |
Conditional Permission |
Killetra, Mallow, Co. Cork, |
Permission for the construction of a rear extension to a dwelling house.... login required. |
Details... |
1.6km |
24/04/2024 |
N/A |
Annabella, Mallow, Co Cork, |
Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above grou... login required. |
Details... |
1.4km |
12/04/2024 |
N/A |
5 Springwood, Annabella, Mallow, Co Cork |
Permission for removal of front porch structure, removal of two chimney structures, extension of hallway and sitting room to front, amendment of front façade and glazing at kitchen, demolition of existing rear conservatory, construction of new single storey rear living room extension and patio area... login required. |
Details... |
1.6km |
05/04/2024 |
N/A |
Dairygold Mallow, Annabella, Mallow, Co Cork |
Permission for construction of a new Biomass Plant for the generation of steam as part of the decarbonization road map for the business. The development will consist of the construction of a single-storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height 24.342m above ground lev... login required. |
Details... |
2km |
26/03/2024 |
Conditional Permission |
Navigation Road, Killetra, Mallow, Co.Cork |
Permission to demolish existing dwelling house and adjoining outhouses, and construction of replacement dwelling house with adjoining storage shed and all associated ... login required. |
Details... |
1.7km |
15/03/2024 |
Conditional Permission |
Leadon, Navigation Road, Annabella, Mallow Co Cork |
The development consists of: 1) Permission for retention of the existing dwelling as constructed (change of design from that granted under PD 35, PD 982 & PD 1337). 2) Permission for retention of the existing detached domestic garage as constructed. 3) Permission for retention of t... login required. |
Details... |