2.5km |
18/10/2024 |
N/A |
Kilmurry West / Kilmurry East , Kilmurry McMahon , Co. Clare |
to construct a dwelling house, entrance, driveway, wastewater treatment system and all associated site works... login required. |
Details... |
2.1km |
22/09/2023 |
CONDITIONAL |
Ballygeery West , Co. Clare |
for development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and ai... login required. |
Details... |
2km |
20/09/2023 |
REFUSED |
Kilmurry East , Kilmurry McMahon , Co. Clare |
to construct a new dwelling house, outbuildings and garage, new entrance, access road, and install a new wastewater treatment system along with all associated works ... login required. |
Details... |
1.6km |
25/07/2023 |
CONDITIONAL |
Derrynalicka , Kilmurry McMahon , Co Clare |
for (a) the construction of an extension to the rear of an existing derelict dwelling house and (b) permission to carry out alterations to the existing dwelling, (c) upgrade the existing sewage treatment system, permission to construct a new garage and a new site entrance along with ancillary works... login required. |
Details... |
2.1km |
25/01/2023 |
CONDITIONAL |
Coolmeen , Kilmurry McMahon , Co. Clare. |
for the conversion of a barn to a granny flat along with all associated works ... login required. |
Details... |
2.2km |
26/08/2022 |
N/A |
Ballygerry West , Co Clare |
for development which will consist of a 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c.7.8-hectare site, to include: 1 no. TSO electrical substation building and 1 no. single storey customer substation, control and switch rooms, up to 19 battery storage bloc... login required. |
Details... |
1km |
14/07/2022 |
CONDITIONAL |
Derrygeeha , Kilmurry McMahon , Co Clare |
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works... login required. |
Details... |
2.6km |
17/06/2022 |
CONDITIONAL |
Coolmeen , Kilmurry McMahon , Co Clare |
to construct a dwelling house, garage, wastewater treatment system and soil polishing filter together with all associated site development works... login required. |
Details... |
1.1km |
17/11/2021 |
CONDITIONAL |
Derrygeeha , Kilmurry McMahon , Co Clare |
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works... login required. |
Details... |
2.6km |
06/10/2021 |
CONDITIONAL |
Carrowreagh West , Cranny , Co Clare |
to construct a new dwelling house and garage complete with a sewage treatment system and ancillary works ... login required. |
Details... |
2.9km |
22/09/2021 |
CONDITIONAL |
Crossderry , Kilmurry McMahon , Co Clare |
for development, the development consists of the construction of an underslat tank under existing cattle shed and associated site works... login required. |
Details... |
2.1km |
20/05/2021 |
CONDITIONAL |
Ballygeery West , Co Clare |
to apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house el... login required. |
Details... |