910m |
03/08/2024 |
N/A |
TIERACLEA UPPER , TARBERT , CO. KERRY |
THE CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ENTRANCE, DRIVEWAY, PACKAGED WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
100m |
08/07/2024 |
REFUSED |
Ballydonohoe , Glin , Co. Limerick |
an entrance and drive-way and associated site works... login required. |
Details... |
0m |
22/04/2024 |
N/A |
Tieracalea Lower , Tarbert , Co. Kerry |
CONSTRUCTION OF A DWELLING HOUSE WITH EFFLEUNT TREATMENT SYSTEM, ACCESS DRIVE & ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
12/02/2024 |
CONDITIONAL |
Ballycullane Upper , Glin , Co. Limerick |
the (1) Retention Permission for as-constructed equestrian centre comprising 17no. stables, office/canteen, feed store, tack room, toilet facilities and attached hay barn, (change of design from that previously granted under planning ref. 98/189) (2) Retention permission is also sought for a change of site layout from that pre... login required. |
Details... |
2.3km |
15/12/2023 |
N/A |
Ballycullane Upper , Glin , Co. Limerick |
the (1) Retention Permission for as-constructed equestrian centre comprising 17no. stables, office/canteen, feed store, tack room, toilet facilities and attached hay barn, (change of design from that previously granted under planning ref. 98/189) (2) Retention permission is also sought for a change of site layout from that pre... login required. |
Details... |
2.7km |
29/08/2023 |
N/A |
Tarmon East , Tarbert , Co. Kerry |
(a) construction of detached two storey dwelling with attached carport structure to side (east), (b) new vehicular entrance including alterations to existing roadside boundary, (c) new on-site waste water treatment system and (d) all ancillary site works... login required. |
Details... |
70m |
18/08/2023 |
CONDITIONAL |
Ballydonoghue , Tarbert , Co. Limerick |
the construction of a rear extension to the existing dwelling house, changes to the front elevation of the existing dwelling house, new replacement entrance, drive... login required. |
Details... |
1.6km |
26/06/2023 |
N/A |
SHANAWAY EAST , TARBERT , CO KERRY |
CONSTRUCT 2 NO UNDERGROUND SLURRY TANKS WITH SLATS ... login required. |
Details... |
1.6km |
12/05/2023 |
N/A |
7 DOONARD CRESENT , TARBERT , CO KERRY |
RETAIN HOUSE AS BUILT INCLUDING GARAGE CONVERSION TO A BEDROOM AND ENSUITE AND STORAGE SHEDS ... login required. |
Details... |
1.2km |
04/04/2023 |
N/A |
TIERACLEA LOWER , TARBERT , CO KERRY |
(1) CONSTRUCT NEW EXTENSIONS TO THE FRONT AND REAR OF THE EXISTING DWELLING, (2) MAKE REVISIONS TO THE EXISTING FLOOR LAYOUT PLAN AND ELEVATIONS CHANGES THROUGHOUT TO REFLECT NEW FLOOR LAYOUT AND EXTENSIONS FLOOR LAYOUT, (3) REMOVE THE EXISTING ROOF AND CHIMNEY, (4) CONSTRUCT... login required. |
Details... |
2.4km |
31/03/2023 |
N/A |
TARBERT 220KV SUBSTATION , TARBERT GENERATING STATION , TARBERT ISLAND (TOWNLAND) |
THE PROPOSED DEVELOPMENT WILL COMPRISE OF THE FOLLOWING ON A SITE MEASURING APPROXIMATELY 6.9 HECTARES: (1) REMOVAL OF EXISTING CABLE JOINT, BAY WITHIN TARBERT GENERATING STATION, 220kV SWITCHGEAR WITHIN THE EXISTING TARBERT SUBSTATION COMPOUND AND ASSOCIATED 220kV CABLING; (2) TWO NO. NEW LENGTHS OF 220kV UNDERGROUND CABLING MEASURING APPROXIMATELY 340M EACH, RUNNING BETWEEN TWO NO. NEW UNDERGROUND CABLE JOINT BASE IN TARBERT GENERATING STATION AND THE CONNCETION POINT AT TARBERT SUBSTATION; (3) THE NEW 220kV SWITCHGEAR BAY WITHIN THE EXISTING TARBERT SUBSTATION COMPOUND COMPRISING ASSOCIATED ELECTRICAL EQUIPMENT, INCLUDING CABLE SEALING ENDS, INSULATORS, OVER HEAD CONDUCTORS, SURGE ARRESTORS, LIGHTNING MASTS AND LIGHTING POLES; AND (4) ALL AN... login required. |
Details... |
2.2km |
10/02/2023 |
N/A |
DOONARD LOWER , TARBERT , CO KERRY |
(1) CHANGE THE USE OF EXISTING OSTEOPATH CLINIC TO PRIVATE HOUSE, (2) DEMOLISH EXISTING OLD HOUSE AND CONSTRUCT AN OSTEOPATH CLINIC SERVED BY A EFFLUENT TREATMENT TANK AND POLISHING FILTER ... login required. |
Details... |
1.2km |
17/01/2023 |
N/A |
TIERACLEA LOWER , TARBERT , CO KERRY |
RETAIN EXTENSION TO REAR OF EXISTING DWELLING AND ALL ASSOCIATED WORKS ... login required. |
Details... |
1.2km |
22/12/2022 |
N/A |
CHAPEL STREET , TARBERT , CO KERRY |
RETAIN (A) CHANGE TO ELEVATIONS, (B) REAR EXTENSION AS CONSTRUCTED OUTSIDE OF THE GRANT OF PLANNING OF 04/887, (C) ALL WITHIN REVISED SITE BOUNDARIES AND (D) ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.6km |
20/10/2022 |
CONDITIONAL |
Ballyhoolahan , Glin , Co.Limerick |
demolition of existing cottage and to construct a two storey dwelling, waste water treatment system and all associated site works ... login required. |
Details... |
2.2km |
08/09/2022 |
N/A |
DOONARD LOWER , TARBERT , CO KERRY |
DEMOLISH OLD HOUSE AND CONSTRUCT AN OSTEOPATH CLINIC SERVED BY AN EFFLUENT TREATMENT TANK AND SANCEL POLISHING FILTER... login required. |
Details... |
1.1km |
12/04/2022 |
N/A |
TARBERT GAA CLUB , TIERACLEA LOWER , TARBERT |
(A) DEMOLISH WESTERN WALL, ENTRANCE GATES AND SINGLE STOREY ENTRANCE HUT TO SITE, (B) REMOVAL OF PORTACABIN AND CONTAINER, (C) REPLACEMENT ROOF TO EXISTING SINGLE STOREY BUILDING WITH NEW OVERHANG TO CREATE EXTERNAL COVERED AREA, (D) ALTERATIONS TO EXISTING OPES TO FRONT, REAR AND SIDE (EAST) ELEVATIONS OF EXISTING SINGLE STOREY BUILDING, (E) CONSTRUCTION OF SINGLE STOREY EXTENSION TO FRONT AND SIDE (WEST), (F) NEW 2... login required. |
Details... |
2.7km |
09/02/2022 |
CONDITIONAL |
Ballynagaul , Glin , Co. Limerick |
demolition of twin roofed silos and attached cubicle houses, construction of a slatted cattle house complete with associated underground slurry tanks and feed passages on the same footprint, construction of ancillary concrete yard and all associated site work... login required. |
Details... |
1.7km |
17/01/2022 |
N/A |
21 DOONARD CRESCENT , TARBERT , CO KERRY |
(A) DEMOLISH EXISTING SINGLE STOREY KITCHEN TO THE REAR OF THE DWELLING HOUSE, (B) DEMOLISH THE EXISTING DETACHED DOMESTIC GARAGE, (C) CONSTRUCT A SINGLE STOREY FLAT ROOF EXTENSION TO THE REAR OF THE EXISTING DWELL... login required. |
Details... |