1.7km |
06/09/2023 |
N/A |
SHANACASHEL , GLENCAR , CO KERRY |
RETAIN EXTENSIONS TO HOUSE AND TO RETAIN TWO DOMESTIC STORES/SHEDS... login required. |
Details... |
1.7km |
24/07/2023 |
N/A |
Gortnagan Beg , Glencar , Co. Kerry |
(1) Retention Permission for a building as constructed (and previously granted as a shed in planning reference PL 19-703) to be used as part of the main dwel... login required. |
Details... |
1.8km |
13/07/2023 |
N/A |
SHANACASHEL , GLENCAR , KILLORGLIN |
TO CONSTRUCT A DWELLING HOUSE C/W A SECONDARY TREATMENT UNIT FOLLOWED BY A "ECOFLOW" MODULE OVER A SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED ... login required. |
Details... |
2.3km |
06/04/2023 |
N/A |
LYRANES UPPER , GLENCAR , CO KERRY |
CONSTRUCT A NEW SINGLE STOREY DWELLING HOUSE, SERVED BY A SEPTIC TANK FOLLOWED BY PURAFLO FILTERS SERVED BY A SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
1.7km |
13/01/2023 |
N/A |
GORTNAGAN , GLENCAR , CO KERRY |
(A) RETAIN THE DWELLING HOUSE AS CONSTRUCTED FOR SHORT TERM LETTING, (B) RETAIN THE CHANGE OF USE OF THE STUDIO APARTMENT FROM A DOMESTIC SHED TO A SHOR... login required. |
Details... |
1.4km |
28/11/2022 |
N/A |
GORTNAGAN BEG , GLENCAR , CO KERRY |
(A) CONSTRUCT A DWELLING HOUSE ON SITE, (B) CONVERT EXISTING DERELICT COTTAGE INTO A SHED, (C) CONSTRUCT ENTRANCE, (D) INSTALL A MECHANICAL TREATMENT PLANT, INTERMITTENT FILTER AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.1km |
12/04/2022 |
N/A |
BUNGLASHA SOUTH , GLENCAR , CO KERRY |
RETAIN THE EXISTING TELECOMMUNICATIONS EQUIPMENT ATTACHED TO AN EXISTING TELECOMMUNICATION SUPPORT STURCTURE. THE DEVELOPMENT WILL CONTINUE TO PROVIDE HIGH SPEED WIRELESS BROADBAND AND DATA SERVICES... login required. |
Details... |
2.1km |
13/12/2021 |
N/A |
BUNGLASHA SOUTH , GLENCAR |
RETAIN ALTERATIONS AND EXTENSION TO HOUSE AND PERMISSION TO COMPLETE THE ALTERATIONS AND EXTENSION AND TO REPLACE THE EXISTING SEPTIC TANK WITH AN EFFLUENT TREATMENT TANK AND POLISHING FILTER... login required. |
Details... |
1.8km |
10/12/2021 |
N/A |
EIR EXCHANGE , LYRANES LOWER , GLENCAR |
REPLACE A 24M MONOPOLE TELECOMMUNICATIONS STRUCTURE WITH A 30M LATTICE TELECOMMUNICATIONS STRUCTURE TOGETHTER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS DEQUIPMENT ENCLOSED BY SECURITY FENCING... login required. |
Details... |
2.9km |
26/11/2021 |
N/A |
GORTMALOON WEST , GLENCAR |
CONSTRUCT A SINGLE STOREY DWELLING HOUSE AND DETACHED GARAGE WITH SEPTIC TANK, SECONDARY TREATMENT "PURAFLOW" MODULES AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.3km |
19/11/2021 |
N/A |
LYRANES UPPER , GLENCAR , CO KERRY |
CONSTRUCT A SINGLE STOREY DWELLING HOUSE, SERVED BY A SEPTIC TANK FOLLOWED BY PURAFLO FILTERS SERVED BY A SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
11/08/2021 |
N/A |
AHANE , GLENCARE , CO KERRY |
CONSTRUCT A DWELLING HOUSE SERVED BY AN EFFLUENT TREATMENT TANK AND SANDCELL POLISHING FILTER AND ALL ASSOCAITED SITE WORKS... login required. |
Details... |
650m |
11/06/2021 |
N/A |
CURRAFLUGH DROM EAST BUNGLASHA SOUTH , DROMDOORY CAPPYANTANVALLY DREENAGH AND KEEL , CO KERRY |
DEVELOPMENT ALONG A 4.6KM LONG SECTION OF AN EXISTING 20KV OVERHEAD ELECTRICITY LINE (REFERRED TO AS "THE GLENCAR LINE") LOCATED BETWEEN STRUCTURES 143 TO 196 INCLUSINVE. THE DEVELOPMENT CONSISTS OF REFURBISHMENT AND UPGRADING WORKS INCLUDING (WHERE NECESSARY) REPLACEMENT OF EXISTING POLES, AND THE PROVISION OF 2 NO. NEW POLES, ALONG THE EXISTING OVERHEAD ELECTRICITY LINE. REPLACEMENT POLES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THAT THEY WILL REPLACE. REPL... login required. |
Details... |
2.7km |
04/06/2021 |
N/A |
LYREBOY GORTMALOON WEST SHANACASHEL BREANLEE , COOMLETTA KEEAS BOHEESHIL SHRONAHIREE MORE COORNAMEANA , CURRAGH BEG GORTMALOON EAST DERREENANARYAGH DROMALONHURT LYRANES UPPER AND |
FOR DEVELOPMENT ALONG A 12.6KM LONG SECTION OF AN EXISTING 20KV OVERHEAD ELECTRICITY LINE (REFERRED TO AS "THE GLENCAR LINE") LOCATED BETWEEN STRUCTURES 1 TO 142 INCLUSIVE. THE DEVELOPMENT CONSISTS OF REFURBISHMENT AND UPGRADING WORKS INCLUDING (WHERE NECESSARY) REPLACEMENT OF EXISTING POLES, AND THE PROVISION OF 5 NO. NEW POLES, ALONG THE EXISTING OVERHEAD ELECTIRCITY LINE. REPLACEMENT POLES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO, THE EXISTING STRUCTURES THAT THEY WILL REPLACE. REPLACEMENT AND ... login required. |
Details... |