450m |
11/11/2024 |
N/A |
Lower Aghada, Aghada, Midleton, Co. Cork |
5 no. dwellings including associated detached garage to house No. 2 and detached garage and garden store to house No. 3 together with vehicular entrance from... login required. |
Details... |
240m |
23/10/2024 |
N/A |
Hillside, Aghada, Co. Cork, |
Permission for a new dwelling house at the lower end of the rear garden with a new shared entry access and access road and proprietary sewage treatment system. This permission is similar to permission 19/0645 previously granted and still current on the site.... login required. |
Details... |
2.3km |
22/10/2024 |
N/A |
Wood Cottage, Marlogue, Cobh, Co. Cork, P24TX92 |
Permission for:
1. Single storey extension to the rear/side of our existing dwelling.
2. Elevation changes to the existing dwelling.
3. Proposed site development works.
... login required. |
Details... |
2.9km |
05/09/2024 |
Conditional Permission |
Ardnabourkey, Whitegate, Co. Cork, |
Permission to construct extension to rear of existing portal framed building for storage of machinery and equipment as well as all associated site development works.... login required. |
Details... |
1.1km |
23/08/2024 |
N/A |
Páiric Liam Úi Riain, Rostellan, Co Cork, |
Permission for : 1) The construction of a new first floor extension to accommodate meeting rooms and a multi-functional open space, 2) Changes to the existing elevations to incorpora... login required. |
Details... |
2.3km |
16/08/2024 |
N/A |
Ballynookery, Whitegate, Midleton, Co. Cork |
Outline Permission for part single-storey, part storey and a half dwellinghouse with site entrance, drive way and domestic effluent treatment plant and all associated site development works.... login required. |
Details... |
2.2km |
16/08/2024 |
N/A |
Rostellan, Aghada, Midleton, Co.Cork |
Outline permission for part single storey, part dormer dwelling house with site entrance, driveway and domestic effluent treatment plant, together with all associated site development works... login required. |
Details... |
590m |
13/06/2024 |
Conditional Permission |
Upper Aghada, Midleton, Co.Cork, |
Permission for retention of pre-fabricated, pre-school premises comprising two classrooms with staff and sanitary accommodation together with enclosed and covered play area, including existing ve... login required. |
Details... |
1.5km |
09/05/2024 |
Conditional Permission |
Ballincarroonig, Whitegate, Co.Cork, |
Permission consequent on the grant of outline permission (reference number of outline permission 22/5524) to construct two detached dwellings, new dual vehicular entrance and all associated site works.... login required. |
Details... |
1.5km |
17/04/2024 |
N/A |
Ballincarroonig, Whitegate, Co.Cork, |
Permission consequent on the grant of outline permission (reference number of outline permission 22/5524) to construct two detached dwellings, new dual vehicular entrance and all associated site works.... login required. |
Details... |
1.1km |
16/04/2024 |
Conditional Permission |
Ennistellan House, Upper Range, Knockanemorney, Rostellan, Co.Cork |
Permission for 1)the demolition of an existing single storey extension to the rear elevation; 2) the demolition of the existing single storey detached storage shed; 3) the construction of a new single storey extension to re... login required. |
Details... |
2.6km |
16/04/2024 |
Conditional Permission |
Jamesbrook, East Ferry, Midleton, Co.Cork |
Permission for the construction of a new two storey detached dwelling, a new wastewater treatment unit and percolation area, a new site entrance, and including all associated site works and landscaping... login required. |
Details... |
30m |
04/04/2024 |
Conditional Permission |
Hillside, Aghada, Co.Cork, |
Permission for construction of a dormer type dwelling, detached storage shed and detached home office. Along with a new access road from an existing domestic/agricultural access opposite Forge Road, Aghada, along with new effluent treatment system and percolation area and associated site works.... login required. |
Details... |
710m |
04/04/2024 |
Conditional Permission |
Aghada Hall, Aghada, Co Cork, P25 X368 |
Permission for demolition of existing front porch and construction of new porch/living area to the front of his dwelling.... login required. |
Details... |
2km |
28/03/2024 |
Conditional Permission |
Ballincarroonig Td, Whitegate, Co. Cork, |
Permission to construct a new dwelling house, new vehicular parking area and all associated site works.... login required. |
Details... |
1.2km |
19/03/2024 |
Refused |
Ballincarroonig td, Whitegate, Co. Cork, |
Permission to construct; two storey dwelling house, with attached domestic garage and car-port as well as septic tank and associated percolation area, site entrance and access roadway together with all associated site development works... login required. |
Details... |
1.1km |
11/03/2024 |
N/A |
Ennistellan House, Upper Range, Knockanemorney, Rostellan, Co.Cork |
Permission for 1) the demolition of an existing single storey extension to the rear elevation, 2) the demolition of the existing single storey detached storage shed, 3) the construction of a new single extension to the rear elevation, 4) changes to the existing fro... login required. |
Details... |
20m |
08/03/2024 |
N/A |
Hillside, Aghada, Co.Cork, |
Permission for construction of a dormer type dwelling, detached storage shed and detached home office. Along with a new access road from an existing domestic/agricultural access opposite forge road, Aghada, along with new effluent treatment system and percolation area and associated site works... login required. |
Details... |
710m |
06/03/2024 |
N/A |
Aghada Hall, Aghada, Co Cork, |
Permission for demolition of existing front porch and construction of new porch/living area to the front of dwelling.... login required. |
Details... |
2.4km |
10/01/2024 |
Conditional Permission |
0.56 hectares site within ESB Aghada Generating, Station Ballincarroonig, Aghada, Co Cork P25 XE94 |
The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises : 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fe... login required. |
Details... |