740m |
22/10/2024 |
N/A |
Wood Cottage, Marlogue, Cobh, Co. Cork, P24TX92 |
Permission for:
1. Single storey extension to the rear/side of our existing dwelling.
2. Elevation changes to the existing dwelling.
3. Proposed site development works.
... login required. |
Details... |
1km |
04/10/2024 |
N/A |
Ballyellane, Cobh, Co Cork, |
Permission to construct a new dwelling house (change of layout and design from that granted under Pl.Reg.No. 21/5758), septic tank and percolation area.... login required. |
Details... |
1.2km |
26/09/2024 |
N/A |
Glenview, Ballydaniel More, Ballymore, Cobh, Co.Cork |
Permission to refurbish, alter and extend existing derelict dwelling, construct detached garage/store building, removal of existing mobile home building and all ancillary site development works... login required. |
Details... |
1.9km |
19/09/2024 |
Refused |
Murph's Bar & Restaurant, East Ferry, Garranekinnefeake, Co. Cork |
Permission for the alteration and change of use of the 1st floor accommodation and restaurant area to 2 no. holiday units for short-term letting, construction of a first floor extension, alterations to the elevation, removal ... login required. |
Details... |
1km |
13/09/2024 |
N/A |
Ballyellane, Cobh, Co. Cork, |
Permission to construct a new dwelling house (change of layout and design from that granted under planning Ref 21/5758).... login required. |
Details... |
2.9km |
23/08/2024 |
N/A |
Páiric Liam Úi Riain, Rostellan, Co Cork, |
Permission for : 1) The construction of a new first floor extension to accommodate meeting rooms and a multi-functional open space, 2) Changes to the existing elevations to incorpora... login required. |
Details... |
710m |
28/06/2024 |
Conditional Permission |
Walterstown, Cobh, Co. Cork, |
Permission for: A) The construction of an extension to existing dwelling and all associated works, and B) The Retention of modifications to existing site entrance.... login required. |
Details... |
1.8km |
07/05/2024 |
Refused |
Ballymore, Cobh, Co.Cork, |
Permission to construct a single storey dwelling house (bungalow), bio treatment unit, new vehicular entrance and temporary siting of a mobile home (for a period of nine months)... login required. |
Details... |
690m |
26/04/2024 |
N/A |
Walterstown, Cobh, Co Cork, |
Permission for the construction of an extension to existing dwelling house and all associated works.... login required. |
Details... |
2.3km |
19/04/2024 |
Conditional Permission |
Garranekinnefeake, Midleton, co.Cork, |
Permission for the erection of a 2 storey extension to the front of their existing single storey dwelling... login required. |
Details... |
1.8km |
18/04/2024 |
N/A |
Ballymore, Cobh, co.Cork, |
Permission to construct a single storey dwelling house (bungalow), bio treatment unit, new vehicular entrance, and temporary siting of a mobile home (for a period of nine months)... login required. |
Details... |
2.9km |
09/04/2024 |
Conditional Permission |
Rathcoursey West, Midleton, Co Cork, |
Permission to construct a new split-level boathouse and associated site works. A Natura Impact Statement and an Ecological Impact Assessment will be submitted with this application.... login required. |
Details... |
1.9km |
16/02/2024 |
N/A |
Ashgrove Lodge, Ashgrove, Cobh, Co.Cork |
Permission for retention of the existing waste water treatment unit & percolation area serving his dwelling house & permission for amendments to his existing boundaries... login required. |
Details... |
1.9km |
15/02/2024 |
N/A |
The Coach House, Ashgrove, Cobh, Co. Cork |
Permission for amendments to the existing boundaries to his dwelling house.... login required. |
Details... |
2.8km |
10/01/2024 |
Conditional Permission |
0.56 hectares site within ESB Aghada Generating, Station Ballincarroonig, Aghada, Co Cork P25 XE94 |
The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises : 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fe... login required. |
Details... |
1.3km |
26/10/2023 |
Conditional Permission |
Ballydanielmore, Cobh, Co. Cork, |
Permission for the retention of extensions and alterations to existing dwelling and all associated site works.... login required. |
Details... |
2.9km |
25/10/2023 |
Conditional Permission |
Pier Cottage, Rathcoursey West, Midleton, Co.Cork |
Permission for 1) the demolition of an existing single storey detached garage, 2) the construction of a new single storey extension for living accommodation, 3) the construction of a new single storey (at road level) storage garage and home office linked to main dwelling with an open sided sheltering canopy, 4) t... login required. |
Details... |
700m |
23/10/2023 |
Conditional Permission |
'Old School Corner', Walterstown, Cobh, Co. Cork |
Applying for Retention Planning Permission for the existing concrete plinth as constructed, and planning permission for the construction of an earth bund, (900mm high), and all associated site works.... login required. |
Details... |
2.8km |
21/06/2023 |
Refused |
Bawnard East, Bawnard West, Garranekinnefeake, , Jamesbrook, Kilva, Rathcoursey East,, Scartlea Lower, Scartlea Upper, Co.Cork, |
10 year planning permission for a solar farm with a total area of circa 126 hectares comprising of solar panels on ground mounted frames with a surface area of circa 532,000m2, 21 no. single storey electrical inverter/transformer stations, 5 no. single storey energy storage modules, 3 no. single storey spare parts containers, 12 no. ring main units, 5 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the R630, L7657, L7658 and L7659 public road... login required. |
Details... |