1.6km |
31/05/2024 |
N/A |
Garrandruig, Garryndruig, Bandon, Co.Cork |
Permission for retention of:- A) Modification to previously permitted development - alterations and extension to dwelling house as permitted under planning register number S/1773/90, and B) Construction of domestic garage and all associated site works.... login required. |
Details... |
570m |
15/03/2024 |
Refused |
Skeaf East, Timoleague, Bandon, Co Cork |
Permission for the construction of a single storey dwelling house, construction of an associated detached domestic garage and landscaping, draining and entrance works.... login required. |
Details... |
2.6km |
29/02/2024 |
Refused |
Knocknagallagh, Bandon, Co. Cork, |
Permission for the construction of a single storey dwelling house, waste water treatment system , percolation area and ancillary works.... login required. |
Details... |
1.1km |
17/11/2023 |
Conditional Permission |
Knockbrown, Bandon, Co.Cork, |
Permission to construct a new dwelling, domestic garage, and wastewater treatment system, along with all associated site works... login required. |
Details... |
1.8km |
07/09/2023 |
N/A |
Skeaf West, Clogagh, Timoleague, Bandon, Co. Cork |
Permission for alterations, refurbishment, and extensions to rear of two existing houses, demolition of ancillary sheds, construction of a new detached dwelling, new bin store, vehicular entrance, boundary treatment, new waste water treatment unit, new potable well and all associated site works.... login required. |
Details... |
2.4km |
14/08/2023 |
Conditional Permission |
Knocknagallagh, Bandon, Co.Cork, |
Permission for alterations to existing dwelling house including conversion of attic space to habitable area, construction of a dormer window, provision of roof lights and all associated site works... login required. |
Details... |
1.9km |
21/07/2023 |
Conditional Permission |
Knocknagallagh, Bandon, Co Cork, |
Demolition of existing domestic garage and construction of domestic garage/gym to rear of existing dwelling.... login required. |
Details... |
2.4km |
13/07/2023 |
N/A |
Knocknagallagh, Bandon, Co. Cork, |
Alterations to existing dwelling house including conversion of attic space to habitable area, construction of a dormer window and all associated site works.... login required. |
Details... |
2.2km |
07/07/2023 |
Conditional Permission |
Country View, Garryndruig, Kilbrittain, Co.Cork |
Permission for the installation of a wind turbine and associated works... login required. |
Details... |
1.8km |
07/07/2023 |
N/A |
Skeaf West, Clogagh, Timoleague, Bandon, Co.Cork |
Permission for alterations, refurbishment, and extensions to rear of two existing houses, demolition of ancillary sheds, construction of new detached dwelling, new bin store, new vehicular entrance, boundary treatment, new waste water treatment unit, new potable well and all associated site work... login required. |
Details... |
2.2km |
27/06/2023 |
Conditional Permission |
Kilshinahan, Timoleague, Co Cork, |
A new vehicular entrance off the L6089 to access the permitted solar farm development (Pl.Reg.No. 15/6968, as extended by Pl.Reg. No. 21/4496 and modified by Pl.Reg.No. 22/6452) including all ancillary works.... login required. |
Details... |
1.8km |
09/06/2023 |
N/A |
Skeaf West, Clogagh, Timoleague, Co Cork |
Alteration and refurbishment of two existing houses, demolition of ancillary sheds, construction of new detached dwelling, new vehicular entrance, boundary treatment, new wastewater treatment unit, new potable well and all associated site works.... login required. |
Details... |
2.6km |
03/05/2023 |
N/A |
Knocknagallagh, Bandon, Co.Cork, |
Construction of single storey dwelling house waste water treatment system, percolation area and ancillary site works... login required. |
Details... |
2.3km |
30/03/2023 |
Conditional Permission |
Kilshinahan, Bandon, Co. Cork, |
Alterations (including demolition of sections)/renovations of existing farmhouse and the construction on new extensions/raising roof. Demolition of outbuilding. Alterations to landscaping and the installation of new wastewater treatment system.... login required. |
Details... |
400m |
16/03/2023 |
Refused |
Skeaf East, Timoleague, Bandon, Co. Cork |
Construction of a new single storey dwelling house, construction of an associated detached domestic garage and landscaping, drainage and entrance works.... login required. |
Details... |
2.1km |
08/03/2023 |
Conditional Permission |
Knocknagallagh , Bandon, Co Cork, |
Construction of a detached single storey dwelling with carport, including the provision of a wastewater treatment system, proposed private well, closing the existing site entrance and provision of a new site entrance, and all associated site development works.... login required. |
Details... |
2.4km |
22/12/2022 |
Conditional Permission |
Ummera Smoked Products Ltd, Inchy Bridge, Burrane, Co. Cork |
Retention of single storey extensions to the north, west and east elevations of Fish Processing Unit.... login required. |
Details... |
2.4km |
23/11/2022 |
N/A |
Ummera Smoked Products Ltd., Inchy Bridge, Burrane, Co. Cork |
Permission for Retention of Single Storey Extensions to the North, West and East Elevations of Fish Processing Unit.... login required. |
Details... |
2km |
28/10/2022 |
Conditional Permission |
Kilshinahan, Timoleague, Co. Cork, |
Modification to the solar farm permitted under planning reg no. 15/6968 and extended under 21/4496. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with... login required. |
Details... |
1.4km |
16/09/2022 |
Conditional Permission |
Knockbrown, Bandon, Co. Cork, |
Permission for the construction of 2 no. livestock underpasses, 2 no. effluent holding tanks, and all associated siteworks. ... login required. |
Details... |