2.9km |
05/09/2024 |
N/A |
Dromreagh, Durrus, Bantry, Co. Cork |
Erection of dwelling house, garage and associated site development works... login required. |
Details... |
920m |
08/05/2024 |
Conditional Permission |
Coosane, Ballydehob, Co. Cork, |
Permission for the following work within curtilage of existing farmyard:- (A) Demolition of existing dilapidated disused milking parlour with attached hay barn. (B) For co... login required. |
Details... |
2.8km |
01/03/2024 |
Conditional Permission |
Glannakilleenagh, Ballydehob, Co. Cork, |
Installation of wastewater treatment system and all associated site development works... login required. |
Details... |
2.6km |
28/02/2024 |
Conditional Permission |
Gurteennakilla, Ballydhob, Co. Cork, |
Construct a cattle holding yard with cattle crush and slatted soiled water tank, concrete apron, soiled water sump, pump and float switch, relocate existing feed storage bin and carry out all associated site works... login required. |
Details... |
1.8km |
15/02/2024 |
Conditional Permission |
Derrylahard, Ballydehob, Co. Cork, |
Permission for the following work to existing dwelling house: - (A) Demolition of existing attached stores to the west elevation and rear extension to the north elevation of dwelling (B) For change of use of existing storage shed to east elevation to extended living area of the dwe... login required. |
Details... |
2.4km |
08/12/2023 |
Conditional Permission |
Bawnaknockane, Ballydehob, Co. Cork, |
Construction of dwelling house and for all associated site works... login required. |
Details... |
1km |
16/10/2023 |
Conditional Permission |
Derreennaclough, Ballydehob, Co. Cork, |
Construct a dwelling house, installation of sewerage treatment system and all associated site works... login required. |
Details... |
980m |
22/09/2023 |
N/A |
Derreennaclough, Ballydehob, Co. Cork, |
To construct a dwelling house installation of sewerage treatment system and all associated site works... login required. |
Details... |
2.4km |
20/07/2023 |
Conditional Permission |
Oughtohig, Ballydehob, Co. Cork, |
Permission for retention of mobile home and permission for construction of dwelling house and associated site development works... login required. |
Details... |
2.4km |
22/06/2023 |
N/A |
Oughtohig, Ballydehob, Co. Cork, |
Retention of mobile home and construction of dwelling house and associated site development works... login required. |
Details... |
1.7km |
24/04/2023 |
Conditional Permission |
Derrylahard, Ballydehob, Co. Cork, |
Permission for Retention for the following: - Agricultural shed for use for animal feed and machinery storage, part pony stable and general agricultural associated storage, for separate green house / polytunnel and all associated site works... login required. |
Details... |
2.8km |
13/03/2023 |
Refused |
Shronagree, Ballybane East, & Knockroe Townlands, Ballydehob and Letterlicky Middle, Bantry, Co. Cork |
A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existi... login required. |
Details... |
3km |
16/02/2023 |
N/A |
Shronagree, Ballybane East and Knockroe townlands, Ballydehob and Letterlicky Middle, Bantry, Co. Cork |
A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existin... login required. |
Details... |
2.9km |
23/12/2022 |
N/A |
Shronagree, Ballybane East & Knockroe townlands, Ballydehob and Letterlicky Middle, Bantry, Co. Cork |
A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existi... login required. |
Details... |
2.9km |
15/12/2022 |
N/A |
Shronagree, Ballybane East, Knockroe Townlands, Ballydehob, Letterlicky Middle, Bantry, Co. Cork |
A windfarm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existi... login required. |
Details... |
1.2km |
18/10/2022 |
Conditional Permission |
Derrycarhoon, Ballydehob, Co. Cork, |
Construct a single storey sun room extension onto the South Eastern elevation of the existing dwelling house along with all associated site works... login required. |
Details... |
2.3km |
05/08/2022 |
Conditional Permission |
Lisheenacreagh, Ballydehob, Co. Cork, |
Erection of single storey dwelling house, waste water treatment unit and all associated site works... login required. |
Details... |
2.4km |
22/07/2022 |
Conditional Permission |
Boleagh, Ballydehob, Co. Cork, |
Retention permission for (i) detached dwelling unit (ii) detached studio / workshop and (iii) associated site works, including septic tank system... login required. |
Details... |
3km |
05/05/2022 |
Conditional Permission |
Dromreagh, Durrus, Bantry, Co. Cork |
Erection of dwelling house and associated site development works... login required. |
Details... |
2.3km |
17/09/2021 |
N/A |
Ballybane, Ballydehob, Co. Cork, P81 F893 |
Installation of a new wastewater treatment system and percolation area to serve existing dwelling... login required. |
Details... |