2.7km |
25/04/2022 |
N/A (Pre-Validation) |
ARDEELAN UPPER |
ERECTION OF DWELLING HOUSE AND THE CONNECTION TO EXISTING SEWER... login required. |
Details... |
1.8km |
08/04/2022 |
N/A (New Application) |
EAST PORT (NORTH) |
(1) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM (2) INSTALLATION OF A NEW SEPTIC TANK AND PERCOLATION AREA TO SERVE EXISTING DWELLING HOUSE... login required. |
Details... |
1.3km |
04/03/2022 |
N/A (New Application) |
KILDONEY |
(1) DEMOLITION OF EXISTING REAR EXTENSION TO DWELLING HOUSE (2) ERECTION OF NEW ADDITIONAL ANCILLARY DOMESTIC ACCOMMODATION (3) DECOMMISSIONING OF EXISITNG SEPTIC TANK SYSTEM AND INSTALLATION OF A NEW EFFLUENT TREATMENT PLANT AND SOIL POLISHING AREA... login required. |
Details... |
1.7km |
03/03/2020 |
CONDITIONAL |
BALLYMACAWARD , BALLYSHANNON , DONEGAL PO |
ERECTION OF AN EXTENSION TO SIDE OF EXISTING DWELLING HOUSE... login required. |
Details... |
2.9km |
13/02/2020 |
CONDITIONAL |
ARDEELAN LOWER , ROSSNOWLAGH , DONEGAL PO |
CONSTRUCTION OF A DOMESTIC DWELLING HOUSE WITH CONNECTION TO THE PUBLIC SEWER INCORPORATING THE UPGRADE OF AN EXISTING AGRICULTURAL ACCESS LANE TO SERVE THE DWELLING PROPOSED AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
16/01/2020 |
CONDITIONAL |
ARDEELAN LOWER , ROSSNOWLAGH , DONEGAL PO |
CHANGE OF HOUSE AND DOMESTIC GARAGE DESIGN AND SITING TO THAT APPROVED UNDER PREVIOUS APPLICATION REFERENCE NOS 13/50753 AND 18/50166... login required. |
Details... |
840m |
16/12/2019 |
N/A |
CREEVY TD , BALLYSHANNON , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM & DISPOSAL PAD... login required. |
Details... |
2.3km |
03/12/2019 |
CONDITIONAL |
SHEEGYS , BALLYSHANNON , DONEGAL PO |
INSTALLATION OF A NEW PACKAGED TREATMENT PLANT WITH SAND POLISHING FILTER AND DECOMMISSIONING OF EXISTING SEPTIC TANK... login required. |
Details... |
1.6km |
02/10/2019 |
CONDITIONAL |
CREEVY , BALLYSHANNON , DONEGAL PO |
ERECTION OF AN AGRICULTURAL TYPE BUILDING FOR THE PURPOSE OF DRYING SEA VEGETABLES (SEAWEED) AND FRUIT PROCESSING... login required. |
Details... |
170m |
07/08/2019 |
CONDITIONAL |
CREEVY TD , BALLYSHANNON , CO. DONEGAL |
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA ... login required. |
Details... |
1.5km |
15/07/2019 |
CONDITIONAL |
KILDONEY GLEBE , BALLYSHANNON , DONEGAL PO |
UPGRADING OF THE EXISTING SEPTIC TANK SYSTEM BY THE ADDITION OF A SECONDARY TREATMENT TANK AND TERITARY WETLAND... login required. |
Details... |
1km |
19/06/2019 |
CONDITIONAL |
KILBARRON , BALLYSHANNON , DONEGAL PO |
ERECTION OF A DWELLING HOUSE, EFFLUENT TREATMENT UNIT AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
11/06/2019 |
CONDITIONAL |
ARDEELAN LOWER , ROSSNOWLAGH , DONEGAL PO |
(1) CONSTRUCTION OF EXTENSIONS AND ALTERATIONS TO AN EXISTING HOUSE TO INCLUDE CONSTRUCTION OF A PITCHED ROOF EXTENSION TO PROVIDE ADDITIONAL LIVING SPACE AT GROUND LEVEL AND ADDITIONAL BATHROOM AT FIRST FLOOR LEVEL WITH INTERNAL ALTERATIONS TO THE EXISTING LAYOUT INCLUDING PROVISI... login required. |
Details... |
2.6km |
30/05/2019 |
N/A |
ARDEELAN LOWER , ROSSNOWLAGH , DONEGAL PO |
CONSTRUCTION OF EXTENSIONS AND ALTERATIONS TO AN EXISTING HOUSE TO INCLUDE CONSTRUCTION OF A PITCHED ROOF EXTENSION TO PROVIDE ADDITIONAL LIVING SPACE AT GROUND LEVEL AND ADDITIONAL BATHROOM AT... login required. |
Details... |
870m |
13/05/2019 |
CONDITIONAL |
CLOGHBOLIE , ROSSNOWLAGH , DONEGAL PO |
CONSTRUCTION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING... login required. |
Details... |
2.6km |
07/05/2019 |
N/A |
ARDEELAN LOWER , ROSSNOWLAGH , DONEGAL PO |
CONSTRUCTION OF EXTENSIONS AND ALTERATIONS TO AN EXISTING HOUSE TO INCLUDE CONSTRUCTION OF A PITCHED ROOF EXTENSION TO PROVIDE ADDITIONAL LIVING SPACE AT GROUND LEVEL AND ADDITIONAL BATHROOM AT... login required. |
Details... |
2.5km |
24/04/2019 |
REFUSED |
COOLBEG TD , ROSSNOWLAGH , DONEGAL PO |
ERECTION OF A DWELLING HOUSE INCORPORATING THE CREATION OF A NEW ACCESS ROAD AND CONNECTION TO PUBLIC SEWER ALONG WITH ALL ASSOCIATED SITEWORKS ... login required. |
Details... |
2.6km |
24/04/2019 |
REFUSED |
COOLBEG TD , ROSSNOWLAGH , DONEGAL PO |
ERECTION OF A DWELLING HOUSE INCORPORATING THE CREATION OF A NEW ACCESS ROAD AND CONNECTION TO PUBLIC SEWER ALONG WITH ALL ASSOCIATED SITEWORKS ... login required. |
Details... |
1.2km |
12/04/2019 |
UNCONDITIONAL |
CLOGHBOLIE TD , BALLYSHANNON , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND DOMESTIC GARAGE ALL TO BE SERVED BY A PROPOSED NEW ACCESS ROAD... login required. |
Details... |