2.8km |
22/03/2024 |
N/A |
BUNNAGEE , LETTERKENNY , CO DONEGAL |
(1) CONSTRUCTION OF A NEW BUILDING TO PROVIDE A WAREHOUSE STORAGE FACILITY WITH A FLOOR AREA OF 5,753 SQ/M, (2) CONSTRUCTION OF A NEW SEPARATE OFFICE BUILDING TO SERVE THE DEVELOPMENT WITH A FLOOR AREA OF 167.4 SQ/M, (3) PROVISION OF A NEW FOUL SEWER CONNECTION TO AN EXISTING SEWAGE TREATMENT SYSTEM LOCATED IN THE APPLICANTS ADJOINING YARD, ... login required. |
Details... |
2.8km |
15/03/2024 |
N/A |
BUNNAGEE , LETTERKENNY , CO DONEGAL |
(1) CONSTRUCTION OF A NEW BUILDING TO PROVIDE A WAREHOUSE STORAGE FACILITY WITH A FLOOR AREA OF 5,753 SQ/M, (2) CONSTRUCTION OF A NEW SEPARATE OFFICE BUILDING TO SERVE THE DEVELOPMENT WITH A FLOOR AREA OF 167.4 SQ/M, (3) PROVISION OF A NEW FOUL SEWER CONNECTION TO AN EXISTING SEWAGE TREATMENT SYSTEM ... login required. |
Details... |
2.1km |
13/03/2024 |
N/A |
COOLBOY LITTLE , LETTERKENNY , CO DONEGAL |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE... login required. |
Details... |
1.4km |
11/03/2024 |
N/A |
8 WHITETHORN GROVE , LETTERKENNY , CO. DONEGAL |
(1) DETACHED DOMESTIC GARAGE TO REAR GARDEN, (2) SECOND STOREY EXTENSION AND ROOFLIGHT TO REAR OF EXISTING DWELLING, (3) SINGLE STOREY EXTENSION TO SIDE OF EXISTING DWELLING AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS OFF EXISTING ENTRANCE... login required. |
Details... |
990m |
05/03/2024 |
N/A |
12 LISNENNAN COURT , LISNENNAN , LETTERKENNY |
(1) DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK DWELLING HOUSE, (2) CONSTRUCTION OF REPLACEMENT TWO STOREY DWELLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
28/02/2024 |
N/A |
LISNENNAN , LETTERKENNY , CO DONEGAL |
COMPLETION OF AN UNFINISHED ESTATE CONSISTING OF PLANNING FOR THE CONSTRUCTION OF 38 DWELLINGS CONSISTING OF 20 SINGLE DWELLINGS AND 18 SEMI DETACHED DWELLINGS (AS PREVIOU... login required. |
Details... |
1.4km |
24/02/2024 |
N/A |
LISNENNAN , LETTERKENNY , CO DONEGAL |
COMPLETION OF AN UNFINISHED ESTATE CONSISTING OF PLANNING FOR THE CONSTRUCTION OF 38 DWELLINGS CONSISTING OF 20 SINGLE DWELLINGS AND 18 SEMI DETACHED DWELLINGS (AS PREVIOU... login required. |
Details... |
770m |
16/02/2024 |
N/A |
IDA OFFICE PARK , WINDYHALL , LETTERKENNY |
(1) PLINTH MOUNTED SINGLE SIDED SIGNAGE LOCATED TO THE FRONT OF OFFICE BUILDING 1 CAR PARK (NORTH) COMPOSED OF 20MM FOAMEX LETTERS WHICH WILL APPEAR “ORANGE” ON WHITE DIBOND ALUMINIUM COMPOSITE (200MM THICK), SUPPORTED BY 4” X 6” GALVANISED STEEL FRAME ON REINFORCED CONCRETE BASE 3FT X 2FT X 8FT. THE SIGNAGE HAS AN OVERALL AREA OF 7.1 SQ.M, A... login required. |
Details... |
760m |
12/02/2024 |
N/A |
IDA OFFICE PARK , WINDYHALL , LETTERKENNY |
ERECTION OF (1) PLINTH MOUNTED SINGLE SIDED SIGNAGE LOCATED TO THE FRONT OF OFFICE BUILDING 1 CAR PARK (NORTH) COMPOSED OF 20MM FOAMEX LETTERS WHICH WILL APPEAR "ORANGE" ON WHITE DIBOND ALUMINIUM COMPOSITE (200MM THICK), SUPPORTED BY 4" X 6" GALVANISED STEEL FRAME ON REINFORCED CONCRETE BASE 3FT X 2FT X 8FT. THE SIGNAGE HAS AN OVERALL AREA OF 7.1 SQUARE M... login required. |
Details... |
1.9km |
08/02/2024 |
N/A |
REAR OF PULSE NIGHTCLUB , RAMELTON ROAD , LETTERKENNY |
(1) REMOVAL OF EXISTING SHED ON SITE, (2) CONSTRUCTION OF A TWO STOREY ABOVE GROUND FLOOR LEVEL APARTMENT BLOCK CONTAINING 10 NO. APARTMENTS MADE OF 6 NO. 2 BED APARTMENTS AND 4 NO. 1 BEDROOM APARTMENTS INCLUDING CIRCULATION AND ANCILLARY SERVICES AREAS, (3) EXISTING... login required. |
Details... |
1.2km |
08/02/2024 |
CONDITIONAL |
ST. CONAL'S HOSPITAL , BALLYBOE GLENCAR , LETTERKENNY |
DEVELOPMENT OF A NEW GAS STORAGE COMPOUND WITH ASSOCIATED TANKS, HARD-STANDING TO ACCOMMODATE ACCESS BY ARTICULATED LORRY, PROPOSED RC WALLS AND SECURITY FENCIN... login required. |
Details... |
1.3km |
07/02/2024 |
CONDITIONAL |
48 WHITETHORN GROVE , GORTLEE , LETTERKENNY |
2 NO. SELF CONTAINED RESIDENTIAL UNITS IN LIEU OF PREVIOUSLY APPROVED GRANNY FLAT AND PLANNING PERMISSION FOR THE CONSTRUCTION OF AN EXTENSION TO EXISTING SELF-CONTAINED RESIDENTIAL UNIT... login required. |
Details... |
810m |
22/01/2024 |
REFUSED |
LISNENAN , LETTERKENNY PO , CO. DONEGAL |
THE SUB-DIVISION OF EXISTING DWELLING INTO TWO SEPARATE DWELLINGS INCLUDING RENOVATIONS, ALTERATIONS AND ASSOCIATED SITEWORKS ... login required. |
Details... |
2.9km |
19/01/2024 |
N/A |
DRUMNAHOAGH , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF A STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
600m |
17/01/2024 |
CONDITIONAL |
NO 77 & 77A GLEANN TAIN MANOR , CARNAMUGGAGH , LETTERKENNY |
DEMOLITION OF AN EXISTING (DEFECTIVE/MICA) DUPLEX DWELLING AND RECONSTRUCTION OF A NEW DUPLEX DWELLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
16/01/2024 |
N/A |
DRUMNAHOAGH , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF A STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
... login required. |
Details... |
1.5km |
16/01/2024 |
CONDITIONAL |
3 CULBRACCAN , GORTLEE , LETTERKENNY |
CONSTRUCTION OF AN EXTENSION TO EXISTING DWELLING INCLUDING RENOVATION WORKS AND MINOR ELEVATIONAL CHANGES TO SAME AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.9km |
22/12/2023 |
CONDITIONAL |
HIGH ROAD , LETTERKENNY , CO. DONEGAL |
(1) CHANGE OF USE OF FIRST FLOOR ENTERTAINMENT / FUNCTION ROOM TO GUEST ACCOMMODATION ANCILLARY TO EXISTING PREMISES AND ALL ASSOCIATED INTERNAL AND EXTERNAL WORKS REL... login required. |
Details... |
1.5km |
22/12/2023 |
N/A |
BALLYBOE LISNENNAN AND KILTOY , LETTERKENNY , CO. DONEGAL |
CONSTRUCTION OF A CRECHE FACILITY COMPRISING OF: (1) 2 STOREY BUILDING C.1087M², (2) EXTENSION OF EXISTING ACCESS ROAD, (3) CAR PARKING, (4) OUTDOOR PLAY AREAS, (5) STORM WATER ATTENUATION TANK AND (6) CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
21/12/2023 |
N/A |
BALLAGHDERG , LETTERKENNY , CO DONEGAL |
(1) CONSTRUCTION OF AN EXTENSION TO THE EXISTING DWELLING HOUSE, (2) CHANGE OF USE OF DWELLING HOUSE TO GUEST HOUSE WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |