20m |
22/10/2024 |
N/A |
No.5 The Borough Road , Ballinphull , Cliffoney |
remodel and extend the existing bungalow, change of window layout and addition of 14sqm extension to front / west elevation, together with all associated site works and services... login required. |
Details... |
2km |
05/09/2024 |
N/A |
Creevykeel , Cliffoney , Co. Sligo |
To change the roof from a thatched roof into a slated roofed finish and all ancillary works.... login required. |
Details... |
1.9km |
14/06/2024 |
CONDITIONAL |
Cloysparra , Grange , Co. Sligo |
Permission for development consisting of:
- Proposed Demolition of Existing Extension to Rear of Existing Dwelling and its Replacement with a New Extension.
- Proposed Renovation of Existing Dwelling.... login required. |
Details... |
140m |
19/03/2024 |
CONDITIONAL |
Chapel Rd Ballinphull , Cliffoney , Co. Sligo |
1. Change of use of existing garda station to men’s shed clubhouse
2. new first floor extension over existing station to provide community multi user space.
3. new extens... login required. |
Details... |
3km |
22/12/2023 |
CONDITIONAL |
Dernish Island TD , Dernish Island TD , Co. Sligo |
restoration works to existing derelict cottage and the installation of a septic tank and percolation area and all associated site works... login required. |
Details... |
2.9km |
21/12/2023 |
CONDITIONAL |
Bunduff , Cliffoney , Co. Sligo |
installation of upgraded proprietary effluent treatment system and percolation area to serve existing semi-detached dwelling... login required. |
Details... |
2.5km |
11/12/2023 |
REFUSED |
Bunduff , Cliffoney , Co. Sligo. |
construction of new dwelling house with septic tank and percolation area and all associated site works... login required. |
Details... |
1.6km |
26/08/2023 |
CONDITIONAL |
Creevykeel , Cliffoney , Co. Sligo |
construction of a detached domestic dwelling, garage, a proprietary effluent treatment system and all associated site works... login required. |
Details... |
1.3km |
20/06/2023 |
CONDITIONAL |
CLOONKEEN , CLIFFONY , CO. SLIGO |
the construction of a dwelling house with domestic effluent treatment plant and polishing filter, together with all ancillary works and services... login required. |
Details... |
1.3km |
08/03/2023 |
CONDITIONAL |
Cloonkeen , Cliffoney , Co. Sligo |
development consisting of (a) demolish existing dwelling house on site, (b) demolish existing agricultural shed on site, (c) upgrade vehicular access, (d) construct a Dwelling house, Garage, Septic tank and Percolation area, toget... login required. |
Details... |
210m |
26/12/2022 |
CONDITIONAL |
Cartronkillerdo , Cliffoney , Co. Sligo |
development consisting of single storey sunroom extension constructed to side of dwelling house with all associated site works... login required. |
Details... |
2.2km |
19/12/2022 |
CONDITIONAL |
Bunduff , Castelgal , Co. Sligo |
development consisting of 1. Extension to house. 2. Change of use from common areas on ground floor and guest accommodation on first floor to one residential unit. 3. Raised roof level over boat store, attic storage area with external access door, 2 no. Velux windows and a gable window... login required. |
Details... |
1.3km |
13/12/2022 |
REFUSED |
Cloonkeen Td. , Cliffoney , Co. Sligo |
development consisting of construction of a dwellinghouse with domestic effluent treatment plant and polishing filter, together with all ancillary works and services... login required. |
Details... |
1.5km |
06/12/2022 |
CONDITIONAL |
Edenreagh , Cliffoney , Sligo |
development consisting of extensions as constructed to north ease and south west elevations of existing dwelling... login required. |
Details... |
460m |
30/11/2022 |
CONDITIONAL |
The Cottages , Chapel Road , Cliffoney |
development consisting of construction of a new extension to the rear and side of the existing dwelling, comprising gross floor area at ground floor of 71sqm and 13 sqm at first floor level.... login required. |
Details... |
1.3km |
17/11/2022 |
CONDITIONAL |
Cloonkeen , Cliffoney , Co. Sligo |
development consisting of permission for demolition of existing stone outbuildings, to renovate and extend an existing single storey dwelling, tertiary treatment system and infiltration/treatment area and ... login required. |
Details... |
590m |
05/10/2022 |
CONDITIONAL |
Ballynabrock , Cliffoney , Co Sligo |
development consisting of the construction of: 1. A new site entrance and closing off existing site entrance, 2. Demolition of existing low retaining wall and erection of 30m of ARMCO crash barrier in front of existing house, 3. All associated site works with items described ... login required. |
Details... |
770m |
29/07/2022 |
CONDITIONAL |
Cartronplank , Cliffoney , Co. Sligo |
development consisting of the following: (1) construction of extension to south east elevation, (2) alterations to north east, north west and south west elevations, (3) upgrade of existing septic tank to new proprietary effluent treatment system and percolation area all to existing dwelling... login required. |
Details... |
2.1km |
14/07/2022 |
CONDITIONAL |
Cloysparra , Grange , Co. Sligo |
development consisting of the following changes to house: (a) demolition of existing single storey conservatory to the side of the house and replacement with a single storey extension (42m2); (b) inst... login required. |
Details... |