1.2km |
13/03/2024 |
N/A |
St. Columba’s Catholic Church , Rosses Upper , Rosses Point Sligo |
To demolish the existing porch and boiler house, to construct a new extension (community space) to the western side of the existing church building, to construct new window openings to the rear of the existing sacristy, to widen the existing site entrance and relocate the car park, to provide new landscaped public realm and planting, and all associated s... login required. |
Details... |
1.1km |
18/01/2024 |
CONDITIONAL |
Rosses Upper , Rosses Point , County Sligo |
the development of a single storey extension to the front (southwest side) of the existing single storey house including alterations to the existing front facade and roof, a patio and all associated site development works... login required. |
Details... |
1.3km |
10/01/2024 |
CONDITIONAL |
Parochial House , Rosses Point , Sligo |
The development will consist of the demolition of an existing entrance porch to the front, a single storey lean-to conservatory to the west elevation, and single storey outbuildings to the rear. It also consists of alterations externally to the rear return height and roof, to existing windows to front and both sides and internally to the layout.
The new construction consists of a single storey flat roof ext... login required. |
Details... |
2.1km |
21/12/2023 |
N/A |
Kintogher , Co. Sligo , Ireland |
to construct a dwelling house with sewage treatment system and percolation area, access onto public roadway and all associated site works ... login required. |
Details... |
2.8km |
30/11/2023 |
N/A |
Carney (O'Beirne) Td , Carney , Co. Sligo |
(1) carry out the raising of existing ridge level, conversion of attic space, construction of gables and all associated alterations and elevational changes to existing dwelling house. (2) ... login required. |
Details... |
1.9km |
18/10/2023 |
CONDITIONAL |
St. Helen's , Cregg Rosses Point , Co. Sligo |
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the fr... login required. |
Details... |
1.1km |
16/10/2023 |
CONDITIONAL |
Ballyweelin , Rosses Point , Co. Sligo |
Development of a two storey dwelling and attached domestic carport with roof terrace over, along with new vehicular entrance and connection to public services and all ancillary site development works
(height of proposed building 8,175mm)... login required. |
Details... |
1.7km |
20/09/2023 |
CONDITIONAL |
Cregg Village , Rosses Point , Co. Sligo |
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of... login required. |
Details... |
1.7km |
19/08/2023 |
N/A |
Rosses Punto Limited , Cregg Village , Rosses Point |
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site.
The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine.
To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems.
The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the nati... login required. |
Details... |
1.4km |
27/07/2023 |
CONDITIONAL |
Bayview Stores , Rosses Point , Co. Sligo |
Provision of an off-licence sales area as part of an existing shop premises including all associated works... login required. |
Details... |
2.9km |
10/05/2023 |
CONDITIONAL |
Carney , Carney (O Beirne) Carney , County Sligo |
single storey extensions to the side (c.18sqm) and front (c.9sqm) of existing bungalow, elevational changes to front and side of dwelling including front canopy and new windows and all associated site works... login required. |
Details... |
3km |
02/05/2023 |
CONDITIONAL |
Drumcliffe South , Drumcliffe , Co. Sligo |
Planning permission to retain a detached domestic garage constructed to rear of dwelling house.... login required. |
Details... |
1.1km |
03/04/2023 |
CONDITIONAL |
Joppa Lodge , Ballyweelin , Co.Sligo |
development consisting of the demolition of an existing two storey dwelling and replacement with a new two storey dwelling... login required. |
Details... |
1.8km |
20/03/2023 |
REFUSED |
Colmcille Drive , Rosses Point , County Sligo |
development consisting of construction of a two storey detached domestic dwelling and all associated site works... login required. |
Details... |
2.9km |
09/03/2023 |
CONDITIONAL |
Carney (O'Beirne) , Co. Sligo |
development consisting of decommissioning of existing septic tank and installation of a domestic, on-site wastewater treatment system, percolation area, and all associated site works... login required. |
Details... |
1.4km |
22/02/2023 |
CONDITIONAL |
Rosses Point , Rosses Point , Co Sligo |
Demolition of front porch, rear extension and out building. Construction of new front porch and rear extension which will be partly two storey, alterations to elev... login required. |
Details... |
1.5km |
11/01/2023 |
CONDITIONAL |
Upper Rosses Point Townland , Rosses Point , Co. Sligo |
Development consisting of the demolition of an existing single storey dwelling house and the construction of a new replacement two storey dwelling house, domestic garage together with all associated site development works ... login required. |
Details... |
1.5km |
16/12/2022 |
CONDITIONAL |
Cregg , Rosses Point , Co. Sligo |
development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works... login required. |
Details... |
1.1km |
24/11/2022 |
CONDITIONAL |
Rosses Upper , Rosses Point , Co Sligo |
development consisting of demolition of the existing dwelling and the construction of a detached domestic dwelling and all associated site works and services... login required. |
Details... |