350m |
19/03/2024 |
N/A |
Commercial Retail Unit 2, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24, D24 Y447 |
An amendment to the permitted commercial retail unit 2 at Blocks B/C as granted under ABP. Ref. 303803-19 and as amended under Reg. Ref. LRD23A/0006 and will compromise: i) the provision of an ancillary off-licence sales area of c. 29 sq.m within the permitted commercial retail unit 2 (c. 493 sq.m); ii) the provision of associated signage to the front elevation compromising 1 no. signage panel with backlit pin mounted lettering within the desi... login required. |
Details... |
280m |
09/02/2024 |
N/A |
Site of the former, Cookstown House, Cookstown Way, Tallaght, Dublin 24. |
(a) Planning permission is sought for: (i) the construction of a residential development comprising a total of 84 no. apartments (40 no. one-bedroom units, 36 no. two-bedroom units and 8 no. three bedroom units) in a building ranging in height from 4 to 7 storeys (Part 4, part 5, part 7 storey building). Each apartment is provided with private amenity space in the form of a terrace or balcony space and has access to internal communal amenity space at ground floor level (265.54 sq.m); and external amenity space in the form of a designated communal open space area to the east of the proposed building, a central public plaza between the proposed building and the adjacent under-construction residential scheme at the Cookstown Gateway site to the north (ABP Ref. ABP-303803-19); and an external communal roof terrace at fifth floor level. A total of 190 no. bicycle parking spaces are provided at g... login required. |
Details... |
280m |
26/01/2024 |
GRANT PERMISSION FOR RETENTION |
A9, Cookstown Business Centre, Tallaght, Dublin 24, D24 Y171 |
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m... login required. |
Details... |
2.7km |
02/01/2024 |
REFUSE PERMISSION |
Thomas Davis GAA Club, Kiltipper Road, Tallaght, Co. Dublin |
Install a 21 metre monopole carrying telecommunications and broadband equipment, together with associated equipment and cabinets enclosed within a 2.4 metre palisade fence compound at Thomas Davis GAA Club, Kiltipper Road, Tallaght, Dublin.... login required. |
Details... |
1.5km |
22/12/2023 |
REQUEST ADDITIONAL INFORMATION |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (218sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.... login required. |
Details... |
470m |
07/12/2023 |
GRANT PERMISSION |
B&Q, Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, D24 W5RV. |
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.... login required. |
Details... |
1.5km |
18/10/2023 |
GRANT PERMISSION |
Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24 |
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement ... login required. |
Details... |
2.7km |
29/09/2023 |
GRANT PERMISSION |
At Bus stop No. 5121 Green Isle Road, (outside Corkagh Park), Kingswood, Dublin 22 |
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.... login required. |
Details... |
430m |
25/08/2023 |
REFUSE PERMISSION |
Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24 |
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision... login required. |
Details... |
3km |
24/08/2023 |
REFUSE PERMISSION |
Tallaght Town AFC, Carolan Park, Ballmena Lane, Kiltipper, Tallaght, Dublin 24 |
Construction of a new all-weather pitch complete with perimeter fencing and floodlights and all associated site works.... login required. |
Details... |
1.4km |
24/08/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal l... login required. |
Details... |
430m |
10/08/2023 |
INVALIDATE APPLICATION |
Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24 |
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision... login required. |
Details... |
340m |
13/07/2023 |
GRANT PERMISSION FOR RETENTION |
Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24 |
The development consists of; (i) retention permission for amendments to the previously approved development (ABP Ref. No. ABP-303803-19) including: (a) reduction of the footprint of the approved basement level, providing 67 no. car parking spaces and 316 no. bicycle parking spaces; (b) removal of Core C and the provision of a glazed link bridge at first floor level between the approved blocks C and D; (c) alterations to the layout, size and positioning of the internal communal areas, with all communal amenity rooms and communal facilities now consolidated at ground floor level (407.7sq.m); (d) alterations to the layout, positioning and a reduction in the size of the approved creche unit (from l9lsq.m to 182sq.m) and relocation of associated external play space at ground floor level; (e) omission of the previously approved office space, gym space and 2 no. apartments (previously approved Apartment 1 Block C and Apartment 6 Block D) at ground floor level and the provision of additional commer... login required. |
Details... |
1.5km |
27/06/2023 |
GRANT PERMISSION |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showe... login required. |
Details... |
430m |
28/04/2023 |
REFUSE PERMISSION |
Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24 |
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm... login required. |
Details... |
200m |
28/04/2023 |
GRANT PERMISSION |
Unit 29, Second Avenue, Cookstown Industrial Estate, Dublin 24 |
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.... login required. |
Details... |
1.3km |
28/02/2023 |
DECLARED EXEMPT |
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22. |
The erection of a replacement glasshouse superstructure onto an existing masonry base. Formation of pad footings for the glasshouse support frame. Associated electrical, plumbing & rainwater drainage works associated with the glasshouse.... login required. |
Details... |
450m |
10/02/2023 |
PART 8 APPROVED BY COUNCIL |
Airton Road Extension - (Cookstown Industrial Estate Road to Belgard Road), Tallaght, DUBLIN 24 |
AIRTON ROAD EXTENSION - The Proposed New Link Road from Cookstown Industrial Estate. The proposed works will form part of a wider integrated road network which will result in the creation of a new permeable street connecting the Airton Road to the Cookstown Road and further south to Tallaght Town Centre via an approved Part 8 development. Connecting Tallaght Hospital, Technology University Dublin (TUD), a post primary school, an innovation centre, and a residential community.
The construction of approximately 328 m. of a two-way single carriageway road connecting Cookstown Industrial Estate Road to Belgard Road. The Cross sections consists of a 6.0 metre carriageway, 2.0 metre raised adjacent off-road cycle lanes and 2.5-metre-wide footpaths
The construction of three signal-controlled junctions, ... login required. |
Details... |
0m |
23/01/2023 |
INVALID APPLICATION |
Tallaght University Hospital, Tallaght, Dublin 24, D24 NR04 |
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).... login required. |
Details... |