1.3km |
30/10/2024 |
N/A |
Ballina , Ballycumber , Tullamore Co. Offaly |
The development will consist of the construction of a new dwelling house, new garage, new vehicular entrance, new effluent treatment system and all associated site development works.... login required. |
Details... |
2.2km |
27/09/2024 |
N/A |
Mountarmstrong , Rahan , Tullamore |
retention of an existing domestic garage / shed to the front and side of the existing dwelling house... login required. |
Details... |
2.5km |
20/09/2024 |
N/A |
Scoil Chartaigh Naofa , Rahan , Co. Offaly |
construction of a single storey extension to an existing school comprising classroom accommodation together with additional parking, upgraded drainage & related works ... login required. |
Details... |
700m |
12/08/2024 |
N/A |
DERRIES , RAHAN , CO.OFFALY |
CONSTRUCTION OF (A) MACHINERY STORAGE SHED (B) MANURE PIT/DUNGSTEAD (C) SILAGE PIT RETAINING WALLS (D) CONCRETE YARD AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
24/07/2024 |
CONDITIONAL |
Derries , Rahan , Tullamore Co Offaly |
the demolition of an existing extension, as previously granted under planning permission reference 95/583, located to the side
(South) elevation of the existing dwe... login required. |
Details... |
2.9km |
04/06/2024 |
CONDITIONAL |
New Road Erry Armstrong , Clara , Co. Offaly |
the construction of a new dwelling house, new garage, new vehicular entrance, new effluent treatment system and all associated site development works... login required. |
Details... |
0m |
07/05/2024 |
N/A |
THE DERRIES RAHAN , TULLAMORE , CO. OFFALY |
ONE NUMBER DWELLING HOUSE CONSISTING OF 40 SQUARE METRES AS CONSTRUCTED, WITH PROPOSAL TO CLAD EXISTING DWELLING WITH A NAP PLASTER FINISH AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
12/04/2024 |
CONDITIONAL |
AGHALUSKY RAHAN , TULLAMORE , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM, (D) VEHICULAR ENTRANCE, (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.7km |
02/08/2023 |
CONDITIONAL |
AGHADONAGH , RAHAN , CO. OFFALY |
(A) DOMESTIC GARAGE AS CONSTRUCTED (B) RETENTION PERMISSION FOR REVISED SITE BOUNDARY AND ASSOCIATED SITE WORKS AS CONSTRUCTED CONTRARY TO GRANTED PLANNING PERMISSION REF 05/618... login required. |
Details... |
190m |
11/07/2023 |
CONDITIONAL |
DERRIES , RAHAN , CO.OFFALY |
CONSTRUCTION OF DWELLING HOUSE, DOMESTIC GARAGE/STORE, SEPTIC TANK/ETS PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
06/07/2023 |
CONDITIONAL |
AGHNANANAGH , TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A NEW BUNGALOW DWELLING, DOMESTIC GARAGE, PACKAGED WASTEWATER TREATMENT SYSTEM & SOIL POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS TO COMPLETE THE DEVELOPMENT... login required. |
Details... |
1.1km |
26/04/2023 |
CONDITIONAL |
DERRIES , RAHAN , CO OFFALY |
EXTENSION TO EXISTING CATTLE SHED TO INCLUDE (A) LOOSE BED AREA (B) CUBICLE BEDS (C) UNDERGROUND SLATTED SLURRY STORAGE (D) FEEDING AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
27/03/2023 |
CONDITIONAL |
AGHNANANAGH , TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING, GARAGE, WASTER WATER TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
22/02/2023 |
CONDITIONAL |
BALLINCUR RAHAN , TULLAMORE , CO. OFFALY |
THE CONSTRUCTION OF A NEW SINGLE DWELLING, SEPARATE GARAGE, A NEW ENTRANCE AND DRIVEWAY, NEW HEDGE AT BOUNDARY, NEW SEPTIC TANK, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, SOAKAWAYS, CONNECTION TO MAINS WATER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
14/02/2023 |
CONDITIONAL |
TULLYBEG , RAHAN , CO. OFFALY |
ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
08/02/2023 |
N/A |
BALLINCUR RAHAN , TULLAMORE , CO. OFFALY |
THE CONSTRUCTION OF A NEW SINGLE DWELLING, SEPARATE GARAGE, A NEW ENTRANCE AND DRIVEWAY, NEW HEDGE AT BOUNDARY, NEW SEPTIC TANK, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, SOAKAWAYS, CONNECTION TO MAINS WATER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
21/12/2022 |
CONDITIONAL |
GOLDSMITHSLOT , RAHAN , CO. OFFALY |
THE CONSTRUCTION OF A NEW DWELLING HOUSE, SEPTIC TANK/ETS PERCOLATION AREA, DOMESTIC SHED/STORE AND ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
21/12/2022 |
CONDITIONAL |
GOLDSMITHSLOT , RAHAN , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE SEPTIC TANK/ETS PERCOLATION AREA DOMESTIC SHED/STORE, BORED WELL AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
19/09/2022 |
CONDITIONAL |
NEWTOWN , TULLAMORE , CO. OFFALY |
DEMOLITION OF EXISTING SINGLE STOREY DERELICT COTTAGE, THE CONSTRUCTION OF A NEW SINGLE DWELLING CONSISTING OF A SINGLE STOREY AND STOREY-AND-A-HALF BUILDING., SEPARATE GARAGE, REFURBISHMENT OF... login required. |
Details... |