2.7km |
22/03/2024 |
N/A |
Springfield , Tipperary , Co. Tipperary |
a new dwelling house, new entrance, driveway, effluent treatment system and percolation area and all associated siteworks and boundary alterations as may be required... login required. |
Details... |
60m |
14/02/2024 |
N/A |
Newtown , Donohill , Co. Tipperary |
the refurbishment and extension of existing derelict dwelling house to include the installation of effluent treatment system and associated site development works... login required. |
Details... |
2.1km |
09/02/2024 |
CONDITIONAL |
Shanballymore , Donohill , Co. Tipperary. |
entrance, dwelling house, domestic garage, sewage treatment system, percolation area and associated site works... login required. |
Details... |
860m |
05/01/2024 |
N/A |
Kyle and Kyleagarry , Gortdrum , Co. Tipperary |
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. |
Details... |
2.1km |
18/12/2023 |
CONDITIONAL |
The Beeches , Kingswell , Tipperary |
(1) the garden shed/ water pump house; (2) the portacabin; (3) the stables/storage building; (4) and all associated site and ancillary works... login required. |
Details... |
2.9km |
12/12/2023 |
CONDITIONAL |
Gotinstown , Tipperary , Co. Tipperary |
a dwelling extension to the side of an existing dwelling... login required. |
Details... |
2.1km |
06/12/2023 |
CONDITIONAL |
Farranaclara , Donohill , Co. Tipperary |
the change of house type from that previously approved under permitted Planning Permission reference number 2360120 together with all associated site works... login required. |
Details... |
2.1km |
25/10/2023 |
N/A |
Farranaclara , Donohill , Co. Tipperary |
the change of house type from that previously approved under permitted Planning Permission reference number 2360120 together with all associated site works... login required. |
Details... |
2.9km |
13/09/2023 |
REFUSED |
Ballykisteen Hotel , Gotinstown , Limerick Junction |
1) to extend existing watermain network 2) Permission for Retention of a borehole/well, ancillary infrastructure and all associated site works... login required. |
Details... |
3km |
30/08/2023 |
CONDITIONAL |
Ballysimon , Tipperary , Co. Tipperary |
the construction of a milking parlour, a slatted cubicle/straw-bedded house, and a silage pit, together with all associated facilities, concrete yards, and site works. In addition, retention permission is sought for an underground slatted storage tank... login required. |
Details... |
2km |
26/07/2023 |
CONDITIONAL |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
3km |
13/07/2023 |
CONDITIONAL |
Reddanswalk , Dundrum Road , Tipperary Co. Tipperary |
Spraoi Playschool to operate as a part-time childcare service with extension of operating hours by 1 hour, Monday to Friday inclusive. Previous permitted operating hours were from 9am – 1pm. Proposed operating hours will be from 9am – 2pm... login required. |
Details... |
2km |
28/06/2023 |
N/A |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
1.9km |
03/05/2023 |
CONDITIONAL |
Limerick Junction , Co. Tipperary |
the upgrade of the Limerick Junction Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank complete with cleaning system and access stai... login required. |
Details... |
1.9km |
24/04/2023 |
N/A |
Limerick Junction , Co Tipperary |
construction of a storm water holding tank complete with cleaning system and access stairs and return pumping station; construction of a new sludge drying reed beds; sludge pump station; final effluent wash water pump station; control kiosk; and all ancillary site developments works... login required. |
Details... |
3km |
10/03/2023 |
CONDITIONAL |
Cauteen , Donohill , Co. Tipperary |
existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. |
Details... |
2.1km |
23/02/2023 |
CONDITIONAL |
Farranaclara , Donohill , Co. Tipperary |
a vehicular entrance, dwelling house, domestic garage, domestic wastewater treatment system with polishing filter together with all associated site works at Farranaclara, Donohill, Co. Tipperary.... login required. |
Details... |
2.4km |
17/02/2023 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. |
Details... |
2.9km |
16/08/2022 |
CONDITIONAL |
Barnanalleen , Moanmore and , Seskin |
a solar PV development on a 92 ha site consisting of:
- The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping;
- 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses;
- 1 no. on-site IPP switching substation and associated works a... login required. |
Details... |
2.6km |
08/08/2022 |
N/A |
Barnanalleen Moanmore Seskin , Seskin , Co Tipperary |
a solar PV development on a 92 ha site consisting of: (1) The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; (2) 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; (3) 1 no. on-site IPP switchi... login required. |
Details... |