340m |
05/04/2024 |
N/A |
SPA ROAD/CONNOR PASS ROAD JUNCTION , GORTONORA , DINGLE CO KERRY |
CHANGE OF USE OF THE EXISITNG DING CREAMERY/BREWERY BUILDING TO RESIDENTIAL UNITS. THE DEVELOPMENT WILL CONSIST OF THE CONVERSION OF THE EXISTING BUILDING INTO 9 RESIDENTIAL LIVING UNITS, ONE SINGLE STOREY AND EIGHT SINGLE STOREY UNITS WITH ATTIC ACC... login required. |
Details... |
830m |
21/03/2024 |
N/A |
THE WOOD , DINGLE , CO KERRY |
(A) THE REMOVAL OF A MAST SUPPORTED TENSILE CANVAS FRONT ENTRANCE CANOPY, (B) TO CONSTRUCT A SINGLE STOREY EXTENSION THE FRONT OF THE DINGLE OCEANWORLD COMPLEX TO ALLOW FOR A NEW PUBLIC ENTRANCE FOYER, (C) NEW SINAGE ... login required. |
Details... |
200m |
11/03/2024 |
N/A |
47 John Street , Dingle , Co Kerry |
PERMISSION FOR DEVELOPMENT TO CONSTRUCT A FIRST FLOOR EXTENSION TO THE REAR OF THE DWELLING HOUSE INCLUDING ALTERING SOME OF THE INTERNAL LAYOUT, FITTING AN ESCAPE VELUX TO THE REAR OF AN EXISTING BEDROOM & ALL NECESSARY SITE WORKS... login required. |
Details... |
490m |
19/02/2024 |
N/A |
The Lower Colony , Farranakilla , Dingle |
Full permission to ( A ) demolish rear extension to existing dwelling house, (B) Carryout renovation works to existing dwelling house to include the insta... login required. |
Details... |
1.2km |
02/02/2024 |
N/A |
8 Radharc na Mara , An Choill Daingean Uí Chúis , Co. Ciarraí |
(a) demolition of (i) single storey element to side (west), (ii) 2 no. bay windows, including gable wall over one, to front and (iii) concrete barges to roof, (b) blocking up existing door/window opes to side (east), (c) removal of stone cladding to front a... login required. |
Details... |
2.6km |
30/01/2024 |
N/A |
KILFOUNTAN , DINGLE , CO KERRY |
TO CONSTRUCT A SINGLE STOREY DWELLING HOUSE SERVED BY A WASTEWATER TREATMENT UNIT DISCHARGING TO A SOIL POLISHING FILTER, ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
90m |
26/01/2024 |
N/A |
Main Street Dingle , Dingle , Co. Kerry |
Permission to redevelop existing premises on Main Street, Dingle to contain (i) Bar and external toilets at ground level (ii) 1 no. (double volume) apartment to occupy the first and second floors and (iii) access stairwell to apartment at rear all at Main Street Dingle... login required. |
Details... |
350m |
22/01/2024 |
N/A |
Páirc An Aghasaigh Farran , Bóthair An Phoist Daingean Uí Chúis , Contae Chiarrai. |
Proposals include the demolition of the existing single storey flat roofed club house (213 SM) & the construction of a new Club House to replace same which will include to the eastern side of the entrance 4 no. dressing rooms, referee, physio, storage & plant rooms and to the western side of the entrance facilities including 2 no. community rooms, meeting room, office & toilet facilities. This structure will be single storey with an 'A' type roof, The overall floor area is 700 Sq. Meters with a ridge height of 6.9 meters, This building will be located along the same orientation of the existing dressing rooms. The existing boundary wall & gated entrance to Bóthair An Phoise & Bóthar na bPiarsach ( Dingle Relief Road ) is to be altered including the lowering of same with a view to opening up Páirc An Ághasaigh and the associated facilities. The goals & ball netting adjacent to the location of the club house will be revised to allow for proposed works. The existing Training Facilities to the N/W of the site will be realigned to provide better usage of this space and are to include flood lighting. A 3G area will also be created in this area, to facilitate winter training, which will be enclosed with metal fencing and flood light. ... login required. |
Details... |
390m |
15/01/2024 |
N/A |
HOLY GROUND , DINGLE , CO KERRY |
RENOVATE AND MAKE ALTERATIONS TO AN EXISTING DWELLING HOUSE, NAMELY (A) CHANGE OF USE FROM A DWLLING HOUSE TO RETAIL UNIT ON THE GROUND FLOOR INCORPORATING A REAR EXTENSION, (B) MAKE ALLOWANCES FOR ACCESS TO A N... login required. |
Details... |
460m |
15/01/2024 |
N/A |
BOB GRIFFIN'S BAR , STRAND STREET , DINGLE |
Planning permission for (i) provision of a glazed lobbied and fully enclosed canopy over an existing paved seating area to the rear of the main building and associated works including the provision of new glazed doors to this area, (ii) internal alterations including change of use of existing service area to the rear at ground floor level to storage space, (iii) change of... login required. |
Details... |
2.5km |
12/01/2024 |
N/A |
Ballyheabought , Dingle , Co Kerry |
Permission for development to construct an extension to his existing shed including all necessary site works... login required. |
Details... |
440m |
20/12/2023 |
N/A |
2 CHAPEL LANE , DINGLE , CO KERRY |
RETAIN REAR RESPITE BALCONY STRUCTURE WITH SCREENING TO MY DWELLING HOUSE... login required. |
Details... |
2.7km |
19/12/2023 |
N/A |
Garfinny , Dingle , Co. Kerry |
for a 88.2sqm, two-storey, split-level (ground and below ground level) extension to the side (east) of the existing 91.9sqm, single-storey detached cottage, maintaining the roof height of the existing cottage. It is also p... login required. |
Details... |
1.7km |
11/12/2023 |
N/A |
Milltown , Dingle , Co Kerry |
permission for development to renovate their dwelling house. The proposed works will include: (A) Altering the internal layout. (B) Demolishing the existing Utility and constructing a new structure ... login required. |
Details... |
1.2km |
23/11/2023 |
N/A |
An Baile Beag , Daingean Ui Chuis , Co.Chiarrai. |
(1) Retention Permission to retain an existing detached home office; (2) Permission for the construction of two storey extension to the rear of existing building, internal and external ... login required. |
Details... |
480m |
16/11/2023 |
N/A |
Emlagh West , Cooleen , Dingle Co. Kerry |
(A) Retention permission to retain additional floor area of an existing dwelling house comprising additional building width, additional building height and attic accommodation. (B) Retention permission to retain an existing garden shed. (C) Planning permission to construct a sing... login required. |
Details... |
260m |
16/11/2023 |
N/A |
CORNER OF MAIN STREET AND GREEN STREET , DINGLE , CO KERRY |
RETAIN ALL AS CONSTRUCTED AN EXISTING RETAIL UNIT ON THE GROUND FLOOR WITH 2 NUMBER APARTMENTS ON THE FIRST AND SECOND FLOOR'S OVERHEAD... login required. |
Details... |
780m |
16/11/2023 |
N/A |
THE WOOD , DINGLE , CO KERRY |
TO CONSTRUCT TWO NUMBER TWO STOREY DWELLING HOUSES, BOTH CONNECTED TO PUBLIC SERVICES AND TO INCLUDE ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
1.2km |
10/11/2023 |
N/A |
An Baile Beag , Daingean Ui Chuis , Co.Chiarrai. |
Invalid- (1) retention permission of existing detached home office; (2) construction of two storey extension to the rear of existing building; internal a... login required. |
Details... |
440m |
03/11/2023 |
N/A |
CUMANN LUATHCHLEAS GAEL DAINGEAN UÍ CHÚIS , AN FEARANN , DAINGEANN UÍ CHÚIS |
CEITHRE MHURPHICTIUIR A CHROCHADH GO SEACHTRACH AG FEACHAINT SOIR O DHEAS D'FHALLA TEORANN CUMANN LUATHCHLEAS GAEL DAINGEAN UI CHUIS. (HANG FOUR MURALS EXTERNALLY LOOKING SOUTH-EAST TO THE BORDER WALL OF DAINGEAN UI CHUIS'S GAA CLUB)... login required. |
Details... |