1.8km |
19/04/2022 |
N/A |
Money Upper , Coolkenna , Co. Wicklow |
change of use of 2 no. traditional stone buildings from agricultural use to commercial short term letting use consisting of 3 no. short term letting units with services and all associated site works... login required. |
Details... |
2.4km |
08/04/2022 |
N/A |
Killenure , Coolkenno , Co. Wicklow |
the construction of a two storey dwelling, detached double garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works... login required. |
Details... |
2.8km |
03/03/2022 |
CONDITIONAL |
The Gallery , Kilquiggan , Shillelagh |
change of use of dwellinghouse from residential use to commercial short term letting use... login required. |
Details... |
2.8km |
03/02/2022 |
N/A |
The Gallery , Kilquiggan , Shillelagh |
change of use of dwelling house from residential use to commercial short term letting use... login required. |
Details... |
2.8km |
08/10/2021 |
CONDITIONAL |
Kilquiggan , Coolkenna , Co. Wicklow |
change of use of 2no. dwelling houses (Kilquiggin Cottages) from residential use to commercial short term letting use ... login required. |
Details... |
2.7km |
03/09/2021 |
CONDITIONAL |
Munny Lower , Tullow , Co Carlow |
construction of a part two storey , part single storey dwelling, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works ... login required. |
Details... |
2.4km |
22/07/2021 |
N/A |
Killenure , Coolkenno , Co. Wicklow |
construction of a two storey dwelling, detached garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works... login required. |
Details... |
2.9km |
04/05/2021 |
CONDITIONAL |
Kilquiggin , Coolkenna , Co. Wicklow |
upgrade existing sewerage facilities and all associated site works... login required. |
Details... |
650m |
30/04/2021 |
CONDITIONAL |
Aghowle Cottage , Aghowle Lower , Shillelagh |
extension to the rear of existing house, retention of alterations to roof and windows on existing extension that was previously granted permission under planni... login required. |
Details... |
2.1km |
20/04/2021 |
CONDITIONAL |
Money Upper , Coolkenno , Tullow |
existing front boundary wall constructed on our site and all associated works... login required. |
Details... |
2.9km |
20/04/2021 |
N/A |
Kilquiggin , Coolkenno , Co. Wicklow |
upgrade existing sewerage facilities and all associated site works... login required. |
Details... |
590m |
09/02/2021 |
CONDITIONAL |
Coolkenna , Tullow , Co. Carlow |
300 sq. metre gym / community room and the installation of a wastewater treatment system and all ancillary site works... login required. |
Details... |
200m |
01/02/2021 |
CONDITIONAL |
Crab Lane , Coolkenna , Co Wicklow |
to construct agricultural machinery store on my site... login required. |
Details... |
2.4km |
24/11/2020 |
N/A |
Killenure , Coolkenno , Co. Wicklow |
construction of a two storey dwelling, detached garage, onsite wastewater treatment system and polishing filter, a bored well and all associated ancillary site works... login required. |
Details... |
2.6km |
31/08/2020 |
CONDITIONAL |
Money Lower , Coolkenna , Co. Wicklow |
(1) permission to construct slatted cubicle shed and external slatted tank (2) permission to construct silage pit, concrete aprons and all associated site works... login required. |
Details... |
2.3km |
06/07/2020 |
CONDITIONAL |
Lumcloon , Coolkenna , Tullow |
to construct a dwelling house with services, domestic garage and all associated site works... login required. |
Details... |
2.7km |
11/05/2020 |
CONDITIONAL |
Boley , Shillelagh , Co. Wicklow |
single storey dwelling, garage, bored well, waste water treatment system, new entrance and all associated site works... login required. |
Details... |
460m |
23/02/2020 |
CONDITIONAL |
Coolkenno , Co. Wicklow |
133 sqm office / studio, demolition of 81 sqm stable and store, permission for 304 sqm barn to include 10 no stables, tack room, feed room, grooming area and dungsted and all associated site works... login required. |
Details... |
2.2km |
09/01/2020 |
CONDITIONAL |
Killinure , Coolkenno , Tullow |
vegetable store and polytunnels, proposed new entrance, gravelled yard and all associated site works... login required. |
Details... |
2.3km |
23/12/2019 |
N/A |
Killinure , Coolkenno , Tullow |
vegetable store and polytunnels and all associated site works... login required. |
Details... |