2km |
29/04/2022 |
N/A |
"Old Shirt Factory", Cappagh, Kinsale, Co. Cork |
(i) construction of outdoor activity centre; (ii) ancillary on-site car, bicycle and boat parking provision; (iii) associated signage; (iv) the upgrading of the existing access into and through the site including a swale incorpora... login required. |
Details... |
2.8km |
21/03/2022 |
Conditional Permission |
The Doon, Dunderrow, Kinsale, Co. Cork |
To construct a new dwelling house.... login required. |
Details... |
400m |
16/02/2022 |
N/A |
Tisaxon More, Kinsale, Co.Cork, |
Retention of minor changes to elevations of dwelling house permitted under reg. No. 06/6279 and basement extension and for permission for construction of single storey exte... login required. |
Details... |
2.6km |
07/02/2022 |
N/A |
Dromdough, Ballinspittle, Kinsale, Co.Cork |
The construction of a detached garage to the side of the dwelling and associated site works... login required. |
Details... |
900m |
22/12/2021 |
Unconditional Permission |
Ballywilliam House, Ballywilliam, Kinsale, Co Cork |
Permission for retention of the following works to a dwelling; 1) Erection of all railings to the exterior of the building, garden features and within the grounds. 2) The removal of grassed areas, the introduction oh hard surfaces/surfacing (gravel, paving, curbstones, tarmacadam, etc.) 3) The... login required. |
Details... |
910m |
29/11/2021 |
N/A |
Ballywilliam House, Ballywilliam, Kinsale, Co. Cork, (Which is a Protected Structure (RPS 00722)) |
Retention of a dwelling for the following: i) Erection of all railings to the exterior of the building, garden features and within the grounds ii) The removal of grassed areas, the introduction of hard surfaces/surfacing (gravel, paving, curb stones, tarmacadam etc). iii) The removal of... login required. |
Details... |
2.8km |
15/10/2021 |
Conditional Permission |
Eli Lilly pharmaceutical complex, at , Ballythomas East, Ballythomas West,, Horsehill More North, Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork |
The development consists of a 10 year planning permission for development consisting of an extension to and modifications to a permitted pharmaceutical manufacturing building IE2B, the development will consist of a) a three-storey extension (gross floor area approx. 1,520sq.m. and approx. 27.5m high to parapet) with intermediate access platforms, at the western side of building IE2B, with external ground-mounted plant and equipment, roof stacks, roof-mounted plant and equipment and acoustic screening; b) associated external revisions to the permitted IE2B building including elevational modifications and revisions to roof plan, roof stacks, plant and equipment; c) provision of additional storage vessels (3 No.) in existing bunded bulk solvent storage tank farm to the east of the IE2 building; d) provision of additional bunded waste vessels (2 No.) beside the existing bunded waste solvent tank farm to south of IE4 building; e) provision of additional tanks on southern side of IE2B building (6 No. bunded tanks and 2 No. underground tanks); f) an extension to an on-site berm (permitted under... login required. |
Details... |
1.4km |
01/10/2021 |
Unconditional Permission |
Abbey Lands, Kinsale, Co. Cork, |
To construct single storey side extension to existing dwelling with associated site works.... login required. |
Details... |
1.9km |
21/09/2021 |
Conditional Permission |
`Former Shirt Factory', Cappagh, Kinsale, Co. Cork |
(i) Demolition of the existing annexes to the front elevation and side elevation of the `Former Shirt Factory’ (which is to become the production hall) , in addition to demolition of the steel ruin frame structure on site, (ii) Modernisation of existing building elevations (the proposed production hall), comprising alterations to the building façade, including revised material finishes to the roof and elevations incorporating fenestration changes allowing for a brewery and distillery at ground floor level, (iii) Construction of extension to the front elevation of the existing building on site (the proposed production hall) consisting of ancillary office space, retail space at first floor... login required. |
Details... |
1.9km |
03/09/2021 |
Conditional Permission |
Currahoo House, Currahoo, Ballinspittle, Co. Cork |
To construct a new dwelling house and a detached domestic garage, to construct a new site entrance, waste water treatment unit and percolation area, new rainwater soakpits, new bored well, with ancillary works and all associated site works.... login required. |
Details... |
2.8km |
30/08/2021 |
Conditional Permission |
Within existing Eli Lilly pharmaceutical complex , Ballythomas East, Ballythomas West, Horsehill More North, Ballyvrin Lower, Dunderrow Kinsale Co. Cork |
The proposed two-phase development located at the north-west corner of the existing IE08 pharmaceutical manufacturing and production building will consist of; demolition of an existing external staircase, internal modifications to the existing IE08 production building and the construction of a new 5 storey extension (including mezzanine floor). The proposed extension will be a non-production administration and support infrastructure facility. It will include; 1) rooms to accommodate electrical, IT and automation infrastructure to service the existing production building and the proposed extension. 2) New Administration facilities including staff changing areas, WC facilities, canteen and offi... login required. |
Details... |
2.5km |
10/08/2021 |
Conditional Permission |
Ballythomas East, Dunderrow, Kinsale, Co. Cork |
An extension to an existing solar farm development with Planning Permission Reference No. 20/05304 (granted 21/09/2020). The development will comprise of a 5.1 MW solar PV farm on a site at Ballythomas East, Dunderrow, Kinsale, Co. Cork immediately to the east of the existing Eli Lilly Pharmaceutical Plant. The electricity generated will be used by Eli Lilly Pharmaceutical site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The development will comprise of photovoltaic panels on a mix of ground mounted and b... login required. |
Details... |
2km |
06/08/2021 |
Refused |
Ardcloyne, Dunderrow, Co. Cork, |
Permission for retention for dwelling house as constructed, site entrance location and revised site boundary previously granted under planning reference 17/4863.... login required. |
Details... |
2.8km |
06/08/2021 |
N/A |
Within existing Eli Lilly pharmaceutical complex, at Ballythomas East, Ballythomas West, Horsehill,, Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork |
Will consist of the demolition of existing external staircase, modifications to the existing IE8 building, and the construction of a 5 storey extension (including mezzanine floor) to be constructed in two phases. The proposed extension will include a range of support accommodation including new entrance, lobby, staff changing areas, WC facilities, canteen, office areas, electrical rooms, new stairs and lift and mechanical/electrical plant, including rooftop plant. External works will include: modifications to existing ground levels to facilitate the proposed extension; ... login required. |
Details... |
1.7km |
06/08/2021 |
Conditional Permission |
Tisaxon More, Kinsale, Co. Cork, |
To construct a detached dwellinghouse, detached garage, vehicle access, wastewater treatment system and site works.... login required. |
Details... |
2.5km |
15/07/2021 |
N/A |
Ballythomas East, Dunderrow, Kinsale, Co. Cork |
An extension to an existing solar farm development with Planning Permission Ref. No. 20/05304 (Granted 18/08/2020 with order No. 20/5215) The development will comprise of a 5.1 MW solar PV farm. The site is immediately to the East of the existing Eli Lilly pharmaceutical plant.... login required. |
Details... |
2km |
14/06/2021 |
Conditional Permission |
Currahoo , Ballinspittle, Co. Cork, |
The construction of a dwelling house, detached domestic garage, waste water treatment system and percolation area, bored well, site entrance and all associated and ancillary site works.... login required. |
Details... |
2.8km |
11/06/2021 |
Unconditional Permission |
Ballinvard, Kinsale, Co. Cork, |
a) Permission for Retention of existing sunroom and b) Permission for the following works i) new windows on side elevation ii) alterations to front door iii) new rear balcony velux to first floor iv) removal of chimney to existing dwelling... login required. |
Details... |
2.2km |
27/05/2021 |
Conditional Permission |
Si Gaoithe, 6 Ringrone, Kinsale, Co. Cork |
The demolition of existing rear extension, construction of a single storey extension to the rear and alterations to the front elevation of the existing dwel... login required. |
Details... |
920m |
10/05/2021 |
Refused |
Ballywilliam House, Ballywilliam, Kinsale, Co. Cork |
The construction of 1. Marshalling area on the shore 2. Fixed access stairs to proposed access pontoon and 3. Proposed floating Jetty and Access Pontoon onto the River Bandon secured with piles into the riverbed.... login required. |
Details... |