1.6km |
28/03/2022 |
N/A |
Ballintotty , Nenagh , Co. Tipperary |
modifications and alterations to dwellinghouse to include internal alterations, revised elevations and the construction of 4 dormers and a rooflight. Planning permission is also sought for the construction of a detached fuel shed and stores, alltogether with all associated works ... login required. |
Details... |
2.9km |
20/01/2022 |
N/A |
Clonteige , Ballymackey , Nenagh |
construct new dwelling, store/garage, sewer treatment unit and percolation area, new entrance and ancillary works... login required. |
Details... |
2.4km |
20/01/2022 |
CONDITIONAL |
Kilkeary , Nenagh , Co Tipperary |
to construct a part storey and a half/part single storey dwelling house, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |
2.9km |
23/12/2021 |
N/A |
Clonteige , Ballymackey , Nenagh |
new dwelling, store/garage, sewer treatment unit, percolation area, new entrance and ancillary works... login required. |
Details... |
2.8km |
26/10/2021 |
N/A |
Knockalton Upper , Nenagh , Co. Tipperary |
demolition of part of existing structures and extension of dwelling house and revision of elevations... login required. |
Details... |
1.7km |
15/10/2021 |
CONDITIONAL |
Shanbally , Norwood , Nenagh Co. Tipperary |
construction of dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works... login required. |
Details... |
2.1km |
08/10/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co. Tipperary |
new dormer type dwelling house with adjoining domestic garage, entrance on site, waste water treatment system, percolation area and all associated site works... login required. |
Details... |
1.8km |
13/09/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co Tipperary |
to construct an extension to rear of dwelling, change the front door entrance area of the dwelling and carry out all ancillary site works... login required. |
Details... |
2.1km |
06/09/2021 |
N/A |
Kilkeary , Nenagh , Co. Tipperary |
dormer type dwelling house with adjoining domestic garage, entrance on site, waste water treatment system, percolation area and all associated site works... login required. |
Details... |
2.2km |
27/08/2021 |
CONDITIONAL |
Coolderry , Toomevara , Co. Tipperary |
construction of a new single storey dwelling, domestic garage, waste water treatment system, entrance and all ancillary site works... login required. |
Details... |
2.3km |
03/08/2021 |
CONDITIONAL |
Ballinree , Norwood , Nenagh Co. Tipperary |
revised internal layout to as-constructed general purpose room building (Pl Ref: 19600685) and overall site boundaries and PERMISSION for the provision of single storey extensions to the existing general purpose room development to include Clubhouse with associated Kitchen area, 4 number changing rooms with... login required. |
Details... |
2.3km |
16/07/2021 |
N/A |
Ballinree , Norwood , Nenagh |
provision of single storey extension to the existing general purpose room; development to include Clubhouse with associated kitchen area, 4 no changing rooms with associated services and a gymnasium building. Retention planning permission is sought for revised internal layout to as constructed gener... login required. |
Details... |
3km |
13/07/2021 |
CONDITIONAL |
Grennanstown , Toomevara , Nenagh |
traditional single storey dwelling house, domestic garage, proprietary treatment tank, percolation area, entrance and ancillary site work previous planning application number 07510627... login required. |
Details... |
2.2km |
23/06/2021 |
CONDITIONAL |
Clashnevin , Nenagh , Co. Tipperary |
construction of a livestock underpass and effluent holding tank and all associated siteworks... login required. |
Details... |
2km |
07/05/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co Tipperary |
a) removal of the existing single storey prefabricated portacabin classroom structure, b) construction of a new single storey prefabricated portacabin classroom structure complete with ramped/stepped ... login required. |
Details... |
1.4km |
19/03/2021 |
CONDITIONAL |
Kilconane , Kilkeary , Nenagh |
the erection of agricultural structure, to include cubicle housing, milking parlour/dairy and ancillary facilities with effluent storage tank and all associated site works ... login required. |
Details... |
2.1km |
03/02/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co. Tipperary |
as constructed garage including all ancillary works... login required. |
Details... |
1.3km |
22/01/2021 |
CONDITIONAL |
Ballintotty , Nenagh , Co. Tipperary |
first floor conversion works carried out when development granted permission under pl. ref. PLC/11871 were completed and also retention of storage sheds and garage as constructed... login required. |
Details... |
2.1km |
22/12/2020 |
N/A |
Kilkeary , Nenagh , Co. Tipperary |
as constructed garage including all ancillary works... login required. |
Details... |
2.2km |
15/07/2020 |
CONDITIONAL |
Kilkeary , Nenagh , Co. Tipperary |
Retention permission for unauthorised development comprising extension to rear of existing warehouse building ... login required. |
Details... |